{"id":10308,"date":"2019-01-02T09:07:25","date_gmt":"2019-01-02T09:07:25","guid":{"rendered":"https:\/\/www.engineernewsnetwork.com\/blog\/?p=10308"},"modified":"2019-01-09T12:41:41","modified_gmt":"2019-01-09T12:41:41","slug":"no-interruption-of-critical-loads-%e2%80%a8when-transferring-between-utility-and-generator-sources","status":"publish","type":"post","link":"https:\/\/www.engineernewsnetwork.com\/blog\/no-interruption-of-critical-loads-%e2%80%a8when-transferring-between-utility-and-generator-sources\/","title":{"rendered":"No interruption of critical loads \u2028when transferring between utility and generator sources"},"content":{"rendered":"<p>Russelectric, a manufacturer of automatic transfer switches and power control systems, offers its Utility Paralleling System, for ensuring that critical loads experience no interruption when transferring between live utility and generator sources.<\/p>\n<p>The system can also be configured for peak shaving, utility-sponsored load curtailment programs, exporting power to the grid, and for a variety of combined heat and power (CHP) applications.<br \/>\n<script async src=\"\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js\"><\/script><br \/>\n<ins class=\"adsbygoogle\" style=\"display: block; text-align: center;\" data-ad-layout=\"in-article\" data-ad-format=\"fluid\" data-ad-client=\"ca-pub-7565662001938327\" data-ad-slot=\"7585079586\"><\/ins><br \/>\n<script>\n     (adsbygoogle = window.adsbygoogle || []).push({});\n<\/script><br \/>\nThe Russelectric Utility Paralleling System has been used by hospitals, data centres, telecommunications, and banking facilities, as well as airports, water and waste water, and renewable energy facilities.<\/p>\n<p>Russelectric paralleling systems incorporate dual, redundant, hot synchronised programmable logic controllers (PLCs) for system control.<br \/>\nDiscrete switches, meters, and control devices are standard to allow manual control capability in the event that both system PLCs fail.<\/p>\n<p>With the Russelectric Utility Paralleling System, users get soft loading transfer and phase lock synchronising when paralleling with the utility, which reduces transients and controls the loading to the engine generators.<\/p>\n<p>All paralleling systems are UL listed. Selector switches are provided for open\/closed transition, automatic\/manual paralleling of generators and utility sources, and automatic\/manual retransfer between both sources of power.<\/p>\n<p>The <span class=\"highlight highlight-blue\"><a href=\"http:\/\/www.russelectric.com\" target=\"_blank\" rel=\"noopener\">Utility Paralleling System<\/a><\/span> offers a choice of either momentary paralleling with the utility or sustained paralleling for soft loading.<\/p>\n<p>Also available is paralleling of generator sets with the utility upon return of the utility source after power interruption.<\/p>\n<p>System operation begins with testing in closed-transition mode with no interruption of the load.<\/p>\n<p>Generators are then paralleled with the utility and the load is transferred to them. Upon completion of testing, the load is retransferred through closed-transition to the utility source without disturbance.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Russelectric, a manufacturer of automatic transfer switches and power control systems, offers its Utility Paralleling System, for ensuring that critical loads experience no interruption when transferring between live utility and generator sources. The system can also be configured for peak shaving, utility-sponsored load curtailment programs, exporting power to the grid, and for a variety of &hellip;<\/p>\n","protected":false},"author":1,"featured_media":10309,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[104],"tags":[5488,5487,5489],"class_list":["post-10308","post","type-post","status-publish","format-standard","has-post-thumbnail","","category-electronics","tag-automatic-transfer-switches-and-power-control-systems","tag-russelectric-utility-paralleling-systems","tag-utility-paralleling-system"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>No interruption of critical loads \u2028when transferring between utility and generator sources - Engineer News Network<\/title>\n<meta name=\"description\" content=\"Russelectric, a manufacturer of automatic transfer switches and power control systems, offers its Utility Paralleling System, for ensuring that critical loads experience no interruption when transferring between live utility and generator sources\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.engineernewsnetwork.com\/blog\/no-interruption-of-critical-loads-\u2028when-transferring-between-utility-and-generator-sources\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"No interruption of critical loads \u2028when transferring between utility and generator sources - Engineer News Network\" \/>\n<meta property=\"og:description\" content=\"Russelectric, a manufacturer of automatic transfer switches and power control systems, offers its Utility Paralleling System, for ensuring that critical loads experience no interruption when transferring between live utility and generator sources\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.engineernewsnetwork.com\/blog\/no-interruption-of-critical-loads-\u2028when-transferring-between-utility-and-generator-sources\/\" \/>\n<meta property=\"og:site_name\" content=\"Engineer News Network\" \/>\n<meta property=\"article:published_time\" content=\"2019-01-02T09:07:25+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2019-01-09T12:41:41+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2019\/01\/Utility-Paralleling-Systems.png\" \/>\n\t<meta property=\"og:image:width\" content=\"535\" \/>\n\t<meta property=\"og:image:height\" content=\"374\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/no-interruption-of-critical-loads-%e2%80%a8when-transferring-between-utility-and-generator-sources\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/no-interruption-of-critical-loads-%e2%80%a8when-transferring-between-utility-and-generator-sources\\\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/#\\\/schema\\\/person\\\/4477342aea8e299c6a21761e513ea8e1\"},\"headline\":\"No interruption of critical loads \\u2028when transferring between utility and generator sources\",\"datePublished\":\"2019-01-02T09:07:25+00:00\",\"dateModified\":\"2019-01-09T12:41:41+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/no-interruption-of-critical-loads-%e2%80%a8when-transferring-between-utility-and-generator-sources\\\/\"},\"wordCount\":286,\"image\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/no-interruption-of-critical-loads-%e2%80%a8when-transferring-between-utility-and-generator-sources\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/wp-content\\\/uploads\\\/2019\\\/01\\\/Utility-Paralleling-Systems.png\",\"keywords\":[\"automatic transfer switches and power control systems\",\"Russelectric Utility Paralleling Systems\",\"Utility Paralleling System\"],\"articleSection\":[\"Electronics\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/no-interruption-of-critical-loads-%e2%80%a8when-transferring-between-utility-and-generator-sources\\\/\",\"url\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/no-interruption-of-critical-loads-%e2%80%a8when-transferring-between-utility-and-generator-sources\\\/\",\"name\":\"No interruption of critical loads \\u2028when transferring between utility and generator sources - Engineer News Network\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/no-interruption-of-critical-loads-%e2%80%a8when-transferring-between-utility-and-generator-sources\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/no-interruption-of-critical-loads-%e2%80%a8when-transferring-between-utility-and-generator-sources\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/wp-content\\\/uploads\\\/2019\\\/01\\\/Utility-Paralleling-Systems.png\",\"datePublished\":\"2019-01-02T09:07:25+00:00\",\"dateModified\":\"2019-01-09T12:41:41+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/#\\\/schema\\\/person\\\/4477342aea8e299c6a21761e513ea8e1\"},\"description\":\"Russelectric, a manufacturer of automatic transfer switches and power control systems, offers its Utility Paralleling System, for ensuring that critical loads experience no interruption when transferring between live utility and generator sources\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/no-interruption-of-critical-loads-%e2%80%a8when-transferring-between-utility-and-generator-sources\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/no-interruption-of-critical-loads-%e2%80%a8when-transferring-between-utility-and-generator-sources\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/no-interruption-of-critical-loads-%e2%80%a8when-transferring-between-utility-and-generator-sources\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/wp-content\\\/uploads\\\/2019\\\/01\\\/Utility-Paralleling-Systems.png\",\"contentUrl\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/wp-content\\\/uploads\\\/2019\\\/01\\\/Utility-Paralleling-Systems.png\",\"width\":535,\"height\":374,\"caption\":\"System offers users soft loading transfer and phase lock synchronising\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/no-interruption-of-critical-loads-%e2%80%a8when-transferring-between-utility-and-generator-sources\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"No interruption of critical loads \\u2028when transferring between utility and generator sources\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/\",\"name\":\"Engineer News Network\",\"description\":\"The ultimate online news and information resource for today's engineer\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/#\\\/schema\\\/person\\\/4477342aea8e299c6a21761e513ea8e1\",\"name\":\"admin\",\"url\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/author\\\/admin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"No interruption of critical loads \u2028when transferring between utility and generator sources - Engineer News Network","description":"Russelectric, a manufacturer of automatic transfer switches and power control systems, offers its Utility Paralleling System, for ensuring that critical loads experience no interruption when transferring between live utility and generator sources","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.engineernewsnetwork.com\/blog\/no-interruption-of-critical-loads-\u2028when-transferring-between-utility-and-generator-sources\/","og_locale":"en_GB","og_type":"article","og_title":"No interruption of critical loads \u2028when transferring between utility and generator sources - Engineer News Network","og_description":"Russelectric, a manufacturer of automatic transfer switches and power control systems, offers its Utility Paralleling System, for ensuring that critical loads experience no interruption when transferring between live utility and generator sources","og_url":"https:\/\/www.engineernewsnetwork.com\/blog\/no-interruption-of-critical-loads-\u2028when-transferring-between-utility-and-generator-sources\/","og_site_name":"Engineer News Network","article_published_time":"2019-01-02T09:07:25+00:00","article_modified_time":"2019-01-09T12:41:41+00:00","og_image":[{"width":535,"height":374,"url":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2019\/01\/Utility-Paralleling-Systems.png","type":"image\/png"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Estimated reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/no-interruption-of-critical-loads-%e2%80%a8when-transferring-between-utility-and-generator-sources\/#article","isPartOf":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/no-interruption-of-critical-loads-%e2%80%a8when-transferring-between-utility-and-generator-sources\/"},"author":{"name":"admin","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1"},"headline":"No interruption of critical loads \u2028when transferring between utility and generator sources","datePublished":"2019-01-02T09:07:25+00:00","dateModified":"2019-01-09T12:41:41+00:00","mainEntityOfPage":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/no-interruption-of-critical-loads-%e2%80%a8when-transferring-between-utility-and-generator-sources\/"},"wordCount":286,"image":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/no-interruption-of-critical-loads-%e2%80%a8when-transferring-between-utility-and-generator-sources\/#primaryimage"},"thumbnailUrl":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2019\/01\/Utility-Paralleling-Systems.png","keywords":["automatic transfer switches and power control systems","Russelectric Utility Paralleling Systems","Utility Paralleling System"],"articleSection":["Electronics"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/no-interruption-of-critical-loads-%e2%80%a8when-transferring-between-utility-and-generator-sources\/","url":"https:\/\/www.engineernewsnetwork.com\/blog\/no-interruption-of-critical-loads-%e2%80%a8when-transferring-between-utility-and-generator-sources\/","name":"No interruption of critical loads \u2028when transferring between utility and generator sources - Engineer News Network","isPartOf":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/no-interruption-of-critical-loads-%e2%80%a8when-transferring-between-utility-and-generator-sources\/#primaryimage"},"image":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/no-interruption-of-critical-loads-%e2%80%a8when-transferring-between-utility-and-generator-sources\/#primaryimage"},"thumbnailUrl":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2019\/01\/Utility-Paralleling-Systems.png","datePublished":"2019-01-02T09:07:25+00:00","dateModified":"2019-01-09T12:41:41+00:00","author":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1"},"description":"Russelectric, a manufacturer of automatic transfer switches and power control systems, offers its Utility Paralleling System, for ensuring that critical loads experience no interruption when transferring between live utility and generator sources","breadcrumb":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/no-interruption-of-critical-loads-%e2%80%a8when-transferring-between-utility-and-generator-sources\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.engineernewsnetwork.com\/blog\/no-interruption-of-critical-loads-%e2%80%a8when-transferring-between-utility-and-generator-sources\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/no-interruption-of-critical-loads-%e2%80%a8when-transferring-between-utility-and-generator-sources\/#primaryimage","url":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2019\/01\/Utility-Paralleling-Systems.png","contentUrl":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2019\/01\/Utility-Paralleling-Systems.png","width":535,"height":374,"caption":"System offers users soft loading transfer and phase lock synchronising"},{"@type":"BreadcrumbList","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/no-interruption-of-critical-loads-%e2%80%a8when-transferring-between-utility-and-generator-sources\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.engineernewsnetwork.com\/blog\/"},{"@type":"ListItem","position":2,"name":"No interruption of critical loads \u2028when transferring between utility and generator sources"}]},{"@type":"WebSite","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#website","url":"https:\/\/www.engineernewsnetwork.com\/blog\/","name":"Engineer News Network","description":"The ultimate online news and information resource for today's engineer","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.engineernewsnetwork.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Person","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1","name":"admin","url":"https:\/\/www.engineernewsnetwork.com\/blog\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts\/10308","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/comments?post=10308"}],"version-history":[{"count":1,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts\/10308\/revisions"}],"predecessor-version":[{"id":10310,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts\/10308\/revisions\/10310"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/media\/10309"}],"wp:attachment":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/media?parent=10308"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/categories?post=10308"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/tags?post=10308"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}