{"id":12822,"date":"2019-06-17T11:45:15","date_gmt":"2019-06-17T10:45:15","guid":{"rendered":"https:\/\/www.engineernewsnetwork.com\/blog\/?p=12822"},"modified":"2019-06-17T11:14:48","modified_gmt":"2019-06-17T10:14:48","slug":"grid-compliance-technology-enables-irish-windfarm-to-overcome-final-hurdle","status":"publish","type":"post","link":"https:\/\/www.engineernewsnetwork.com\/blog\/grid-compliance-technology-enables-irish-windfarm-to-overcome-final-hurdle\/","title":{"rendered":"Grid compliance technology enables Irish windfarm to overcome final hurdle"},"content":{"rendered":"\n<p>Dromadda Beg onshore windfarm in County Kerry, Ireland, is using a static VAR compensator from <strong><a href=\"https:\/\/www.severnde.co.uk\/\" target=\"_blank\" rel=\"noreferrer noopener\" aria-label=\"Severn Drives and Energy (opens in a new tab)\">Severn Drives and Energy<\/a><\/strong> to ensure power output complies with rules for connecting to EirGrid, Ireland&#8217;s state-owned electric power transmission operator.<\/p>\n\n\n\n<p>In recent weeks, the equipment has successfully completed pre-grid and ongoing grid compliance testing, enabling the windfarm to become fully operational.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"572\" height=\"1024\" src=\"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2019\/06\/Dromadda-Beg-572x1024.jpg\" alt=\"\" class=\"wp-image-12824\" srcset=\"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2019\/06\/Dromadda-Beg-572x1024.jpg 572w, https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2019\/06\/Dromadda-Beg-168x300.jpg 168w, https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2019\/06\/Dromadda-Beg-768x1374.jpg 768w, https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2019\/06\/Dromadda-Beg-800x1432.jpg 800w, https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2019\/06\/Dromadda-Beg.jpg 894w\" sizes=\"auto, (max-width: 572px) 100vw, 572px\" \/><figcaption>Dromadda Beg onshore windfarm in County Kerry, Ireland<\/figcaption><\/figure>\n\n\n\n<p>The static VAR compensator consists of devices which work together to regulate the transmission voltage generated by the windfarm&#8217;s three turbines. <\/p>\n\n\n\n<p>These include a statcom, a 10-22kv \/ 4MVAR transformer and a liquid-cooling skid. Severn Drives and Energy supplied, installed and commissioned the equipment within a nine-month timeframe. <\/p>\n\n\n\n<p>A remote access and diagnostic package was also commissioned by the firm.<\/p>\n\n\n\n<p>Severn Drives and Energy worked closely with engineers and project managers from Innogy Renewables Ireland, the windfarm&#8217;s owner, to ensure this complex project ran smoothly and met key deadlines.<\/p>\n\n\n\n<p>Jonathan Jones, Director of Severn Drives and Energy, says: &#8220;Collaboration was a critical success factor, as we had to understand and address the technical requirements of both innogy and the EirGrid network. We deployed our best electrical and system engineering specialists, and their synergy with innogy&#8217;s engineers played a major part in the project&#8217;s success.&#8221;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Dromadda Beg onshore windfarm in County Kerry, Ireland, is using a static VAR compensator from Severn Drives and Energy to ensure power output complies with rules for connecting to EirGrid, Ireland&#8217;s state-owned electric power transmission operator. In recent weeks, the equipment has successfully completed pre-grid and ongoing grid compliance testing, enabling the windfarm to become &hellip;<\/p>\n","protected":false},"author":1,"featured_media":12823,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-12822","post","type-post","status-publish","format-standard","has-post-thumbnail","","category-process"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Grid compliance technology enables Irish windfarm to overcome final hurdle - Engineer News Network<\/title>\n<meta name=\"description\" content=\"Dromadda Beg onshore windfarm in County Kerry, Ireland, is using a static VAR compensator from Severn Drives and Energy to ensure power output complies with rules for connecting to EirGrid, Ireland&#039;s state-owned electric power transmission operator\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.engineernewsnetwork.com\/blog\/grid-compliance-technology-enables-irish-windfarm-to-overcome-final-hurdle\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Grid compliance technology enables Irish windfarm to overcome final hurdle - Engineer News Network\" \/>\n<meta property=\"og:description\" content=\"Dromadda Beg onshore windfarm in County Kerry, Ireland, is using a static VAR compensator from Severn Drives and Energy to ensure power output complies with rules for connecting to EirGrid, Ireland&#039;s state-owned electric power transmission operator\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.engineernewsnetwork.com\/blog\/grid-compliance-technology-enables-irish-windfarm-to-overcome-final-hurdle\/\" \/>\n<meta property=\"og:site_name\" content=\"Engineer News Network\" \/>\n<meta property=\"article:published_time\" content=\"2019-06-17T10:45:15+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2019\/06\/DB-statcom.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"4019\" \/>\n\t<meta property=\"og:image:height\" content=\"2866\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/grid-compliance-technology-enables-irish-windfarm-to-overcome-final-hurdle\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/grid-compliance-technology-enables-irish-windfarm-to-overcome-final-hurdle\\\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/#\\\/schema\\\/person\\\/4477342aea8e299c6a21761e513ea8e1\"},\"headline\":\"Grid compliance technology enables Irish windfarm to overcome final hurdle\",\"datePublished\":\"2019-06-17T10:45:15+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/grid-compliance-technology-enables-irish-windfarm-to-overcome-final-hurdle\\\/\"},\"wordCount\":219,\"image\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/grid-compliance-technology-enables-irish-windfarm-to-overcome-final-hurdle\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/wp-content\\\/uploads\\\/2019\\\/06\\\/DB-statcom.jpg\",\"articleSection\":[\"Process\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/grid-compliance-technology-enables-irish-windfarm-to-overcome-final-hurdle\\\/\",\"url\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/grid-compliance-technology-enables-irish-windfarm-to-overcome-final-hurdle\\\/\",\"name\":\"Grid compliance technology enables Irish windfarm to overcome final hurdle - Engineer News Network\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/grid-compliance-technology-enables-irish-windfarm-to-overcome-final-hurdle\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/grid-compliance-technology-enables-irish-windfarm-to-overcome-final-hurdle\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/wp-content\\\/uploads\\\/2019\\\/06\\\/DB-statcom.jpg\",\"datePublished\":\"2019-06-17T10:45:15+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/#\\\/schema\\\/person\\\/4477342aea8e299c6a21761e513ea8e1\"},\"description\":\"Dromadda Beg onshore windfarm in County Kerry, Ireland, is using a static VAR compensator from Severn Drives and Energy to ensure power output complies with rules for connecting to EirGrid, Ireland's state-owned electric power transmission operator\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/grid-compliance-technology-enables-irish-windfarm-to-overcome-final-hurdle\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/grid-compliance-technology-enables-irish-windfarm-to-overcome-final-hurdle\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/grid-compliance-technology-enables-irish-windfarm-to-overcome-final-hurdle\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/wp-content\\\/uploads\\\/2019\\\/06\\\/DB-statcom.jpg\",\"contentUrl\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/wp-content\\\/uploads\\\/2019\\\/06\\\/DB-statcom.jpg\",\"width\":4019,\"height\":2866,\"caption\":\"The static VAR compensator from Severn Drives and Energy\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/grid-compliance-technology-enables-irish-windfarm-to-overcome-final-hurdle\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Grid compliance technology enables Irish windfarm to overcome final hurdle\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/\",\"name\":\"Engineer News Network\",\"description\":\"The ultimate online news and information resource for today's engineer\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/#\\\/schema\\\/person\\\/4477342aea8e299c6a21761e513ea8e1\",\"name\":\"admin\",\"url\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/author\\\/admin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Grid compliance technology enables Irish windfarm to overcome final hurdle - Engineer News Network","description":"Dromadda Beg onshore windfarm in County Kerry, Ireland, is using a static VAR compensator from Severn Drives and Energy to ensure power output complies with rules for connecting to EirGrid, Ireland's state-owned electric power transmission operator","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.engineernewsnetwork.com\/blog\/grid-compliance-technology-enables-irish-windfarm-to-overcome-final-hurdle\/","og_locale":"en_GB","og_type":"article","og_title":"Grid compliance technology enables Irish windfarm to overcome final hurdle - Engineer News Network","og_description":"Dromadda Beg onshore windfarm in County Kerry, Ireland, is using a static VAR compensator from Severn Drives and Energy to ensure power output complies with rules for connecting to EirGrid, Ireland's state-owned electric power transmission operator","og_url":"https:\/\/www.engineernewsnetwork.com\/blog\/grid-compliance-technology-enables-irish-windfarm-to-overcome-final-hurdle\/","og_site_name":"Engineer News Network","article_published_time":"2019-06-17T10:45:15+00:00","og_image":[{"width":4019,"height":2866,"url":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2019\/06\/DB-statcom.jpg","type":"image\/jpeg"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Estimated reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/grid-compliance-technology-enables-irish-windfarm-to-overcome-final-hurdle\/#article","isPartOf":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/grid-compliance-technology-enables-irish-windfarm-to-overcome-final-hurdle\/"},"author":{"name":"admin","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1"},"headline":"Grid compliance technology enables Irish windfarm to overcome final hurdle","datePublished":"2019-06-17T10:45:15+00:00","mainEntityOfPage":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/grid-compliance-technology-enables-irish-windfarm-to-overcome-final-hurdle\/"},"wordCount":219,"image":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/grid-compliance-technology-enables-irish-windfarm-to-overcome-final-hurdle\/#primaryimage"},"thumbnailUrl":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2019\/06\/DB-statcom.jpg","articleSection":["Process"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/grid-compliance-technology-enables-irish-windfarm-to-overcome-final-hurdle\/","url":"https:\/\/www.engineernewsnetwork.com\/blog\/grid-compliance-technology-enables-irish-windfarm-to-overcome-final-hurdle\/","name":"Grid compliance technology enables Irish windfarm to overcome final hurdle - Engineer News Network","isPartOf":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/grid-compliance-technology-enables-irish-windfarm-to-overcome-final-hurdle\/#primaryimage"},"image":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/grid-compliance-technology-enables-irish-windfarm-to-overcome-final-hurdle\/#primaryimage"},"thumbnailUrl":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2019\/06\/DB-statcom.jpg","datePublished":"2019-06-17T10:45:15+00:00","author":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1"},"description":"Dromadda Beg onshore windfarm in County Kerry, Ireland, is using a static VAR compensator from Severn Drives and Energy to ensure power output complies with rules for connecting to EirGrid, Ireland's state-owned electric power transmission operator","breadcrumb":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/grid-compliance-technology-enables-irish-windfarm-to-overcome-final-hurdle\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.engineernewsnetwork.com\/blog\/grid-compliance-technology-enables-irish-windfarm-to-overcome-final-hurdle\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/grid-compliance-technology-enables-irish-windfarm-to-overcome-final-hurdle\/#primaryimage","url":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2019\/06\/DB-statcom.jpg","contentUrl":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2019\/06\/DB-statcom.jpg","width":4019,"height":2866,"caption":"The static VAR compensator from Severn Drives and Energy"},{"@type":"BreadcrumbList","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/grid-compliance-technology-enables-irish-windfarm-to-overcome-final-hurdle\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.engineernewsnetwork.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Grid compliance technology enables Irish windfarm to overcome final hurdle"}]},{"@type":"WebSite","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#website","url":"https:\/\/www.engineernewsnetwork.com\/blog\/","name":"Engineer News Network","description":"The ultimate online news and information resource for today's engineer","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.engineernewsnetwork.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Person","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1","name":"admin","url":"https:\/\/www.engineernewsnetwork.com\/blog\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts\/12822","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/comments?post=12822"}],"version-history":[{"count":1,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts\/12822\/revisions"}],"predecessor-version":[{"id":12825,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts\/12822\/revisions\/12825"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/media\/12823"}],"wp:attachment":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/media?parent=12822"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/categories?post=12822"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/tags?post=12822"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}