{"id":14026,"date":"2019-09-05T09:00:54","date_gmt":"2019-09-05T08:00:54","guid":{"rendered":"https:\/\/www.engineernewsnetwork.com\/blog\/?p=14026"},"modified":"2019-09-04T11:09:19","modified_gmt":"2019-09-04T10:09:19","slug":"blowout-preventer-hoses-exceed-fire-test-requirements","status":"publish","type":"post","link":"https:\/\/www.engineernewsnetwork.com\/blog\/blowout-preventer-hoses-exceed-fire-test-requirements\/","title":{"rendered":"Blowout preventer hoses exceed fire test requirements"},"content":{"rendered":"\n<p>Power management company Eaton announces an extension to its range of blowout preventer (BOP) hoses, which meet the requirements of the demanding API 16D 2nd Edition drill well specification. <\/p>\n\n\n\n<p>The newly released <strong><a href=\"http:\/\/eaton.com\/Eaton\/ProductsServices\/Hydraulics\/HoseHoseFittings\/IndustrialHose\/Oil-Gas-Exploration\/\">Eaton EC556 BOP hose<\/a><\/strong> is a critical part of oil and gas drilling and exploration equipment where reliability and safety are priority customer needs.\u00a0<\/p>\n\n\n\n<p>Designed to meet the rigorous demands of the industry, the Eaton EC556 BOP hose has been fire tested for five minutes at 700\u02daC (1300\u02daF) in accordance with API 16D 10.1.2 and received a Type Approval Certificate from Lloyd\u2019s Register OD 1000\/499 fire test. <\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"683\" height=\"1024\" src=\"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2019\/09\/EH11695-BOP-application-credit-Design-Pics-Michael-Interisano-683x1024.jpg\" alt=\"\" class=\"wp-image-14029\" srcset=\"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2019\/09\/EH11695-BOP-application-credit-Design-Pics-Michael-Interisano-683x1024.jpg 683w, https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2019\/09\/EH11695-BOP-application-credit-Design-Pics-Michael-Interisano-200x300.jpg 200w, https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2019\/09\/EH11695-BOP-application-credit-Design-Pics-Michael-Interisano-768x1152.jpg 768w, https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2019\/09\/EH11695-BOP-application-credit-Design-Pics-Michael-Interisano-800x1200.jpg 800w\" sizes=\"auto, (max-width: 683px) 100vw, 683px\" \/><figcaption>Drilling Rig Worker Working On The Control Panel On Rig Platform<\/figcaption><\/figure>\n\n\n\n<p>\u201cBuilding on a strong legacy of fluid conveyance product innovation, our EC556 portfolio of blowout preventer hoses are designed to perform when the application needs it most,\u201d said Dimitar Atanasov, product manager, Industrial Hoses, EMEA, Eaton. &amp;ldquo;Our knowledge within this area has led us to develop a hose that offers a solution to meet the needs of the oil and gas drilling industry.\u201d<\/p>\n\n\n\n<p>The Eaton EC556 BOP hose combines high performing spiral reinforcement with flame-resistant rubber cover and is qualified with Eaton\u2019s 1W-ISC fittings (carbon steel and stainless steel) for pressures up to 350 bar (5100psi) and temperatures ranging from -40\u02daC to +100\u02daC (-40\u02daF to +212\u02daF). This constant, specified working pressure rating is available for all sizes -12, -16, -20 and -24 with inside diameters from 19 mm to 38 mm (0.75-in to 1.5-in).&nbsp;<\/p>\n\n\n\n<p>The EC556 hose cover is also abrasion resistant for greater durability.&nbsp;<\/p>\n\n\n\n<p>What\u2019s more, for applications where routing is challenging, the EC556 hose offers greater flexibility than many steel armoured equivalents. <\/p>\n","protected":false},"excerpt":{"rendered":"<p>Power management company Eaton announces an extension to its range of blowout preventer (BOP) hoses, which meet the requirements of the demanding API 16D 2nd Edition drill well specification. The newly released Eaton EC556 BOP hose is a critical part of oil and gas drilling and exploration equipment where reliability and safety are priority customer &hellip;<\/p>\n","protected":false},"author":1,"featured_media":14027,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[106],"tags":[7117,174],"class_list":["post-14026","post","type-post","status-publish","format-standard","has-post-thumbnail","","category-oil-gas","tag-blowout-preventer-hoses","tag-eaton"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Blowout preventer hoses exceed fire test requirements - Engineer News Network<\/title>\n<meta name=\"description\" content=\"Power management company Eaton today announces an extension to its range of blowout preventer (BOP) hoses, which meet the requirements of the demanding API 16D 2nd Edition drill well specification\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.engineernewsnetwork.com\/blog\/blowout-preventer-hoses-exceed-fire-test-requirements\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Blowout preventer hoses exceed fire test requirements - Engineer News Network\" \/>\n<meta property=\"og:description\" content=\"Power management company Eaton today announces an extension to its range of blowout preventer (BOP) hoses, which meet the requirements of the demanding API 16D 2nd Edition drill well specification\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.engineernewsnetwork.com\/blog\/blowout-preventer-hoses-exceed-fire-test-requirements\/\" \/>\n<meta property=\"og:site_name\" content=\"Engineer News Network\" \/>\n<meta property=\"article:published_time\" content=\"2019-09-05T08:00:54+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2019\/09\/EH11695-Eaton-BOP-hose.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"945\" \/>\n\t<meta property=\"og:image:height\" content=\"156\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/blowout-preventer-hoses-exceed-fire-test-requirements\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/blowout-preventer-hoses-exceed-fire-test-requirements\\\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/#\\\/schema\\\/person\\\/4477342aea8e299c6a21761e513ea8e1\"},\"headline\":\"Blowout preventer hoses exceed fire test requirements\",\"datePublished\":\"2019-09-05T08:00:54+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/blowout-preventer-hoses-exceed-fire-test-requirements\\\/\"},\"wordCount\":285,\"image\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/blowout-preventer-hoses-exceed-fire-test-requirements\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/wp-content\\\/uploads\\\/2019\\\/09\\\/EH11695-Eaton-BOP-hose.jpg\",\"keywords\":[\"Blowout preventer hoses\",\"Eaton\"],\"articleSection\":[\"Oil &amp; Gas\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/blowout-preventer-hoses-exceed-fire-test-requirements\\\/\",\"url\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/blowout-preventer-hoses-exceed-fire-test-requirements\\\/\",\"name\":\"Blowout preventer hoses exceed fire test requirements - Engineer News Network\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/blowout-preventer-hoses-exceed-fire-test-requirements\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/blowout-preventer-hoses-exceed-fire-test-requirements\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/wp-content\\\/uploads\\\/2019\\\/09\\\/EH11695-Eaton-BOP-hose.jpg\",\"datePublished\":\"2019-09-05T08:00:54+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/#\\\/schema\\\/person\\\/4477342aea8e299c6a21761e513ea8e1\"},\"description\":\"Power management company Eaton today announces an extension to its range of blowout preventer (BOP) hoses, which meet the requirements of the demanding API 16D 2nd Edition drill well specification\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/blowout-preventer-hoses-exceed-fire-test-requirements\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/blowout-preventer-hoses-exceed-fire-test-requirements\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/blowout-preventer-hoses-exceed-fire-test-requirements\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/wp-content\\\/uploads\\\/2019\\\/09\\\/EH11695-Eaton-BOP-hose.jpg\",\"contentUrl\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/wp-content\\\/uploads\\\/2019\\\/09\\\/EH11695-Eaton-BOP-hose.jpg\",\"width\":945,\"height\":156,\"caption\":\"The Eaton EC556 BOP hose\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/blowout-preventer-hoses-exceed-fire-test-requirements\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Blowout preventer hoses exceed fire test requirements\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/\",\"name\":\"Engineer News Network\",\"description\":\"The ultimate online news and information resource for today's engineer\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/#\\\/schema\\\/person\\\/4477342aea8e299c6a21761e513ea8e1\",\"name\":\"admin\",\"url\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/author\\\/admin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Blowout preventer hoses exceed fire test requirements - Engineer News Network","description":"Power management company Eaton today announces an extension to its range of blowout preventer (BOP) hoses, which meet the requirements of the demanding API 16D 2nd Edition drill well specification","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.engineernewsnetwork.com\/blog\/blowout-preventer-hoses-exceed-fire-test-requirements\/","og_locale":"en_GB","og_type":"article","og_title":"Blowout preventer hoses exceed fire test requirements - Engineer News Network","og_description":"Power management company Eaton today announces an extension to its range of blowout preventer (BOP) hoses, which meet the requirements of the demanding API 16D 2nd Edition drill well specification","og_url":"https:\/\/www.engineernewsnetwork.com\/blog\/blowout-preventer-hoses-exceed-fire-test-requirements\/","og_site_name":"Engineer News Network","article_published_time":"2019-09-05T08:00:54+00:00","og_image":[{"width":945,"height":156,"url":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2019\/09\/EH11695-Eaton-BOP-hose.jpg","type":"image\/jpeg"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Estimated reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/blowout-preventer-hoses-exceed-fire-test-requirements\/#article","isPartOf":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/blowout-preventer-hoses-exceed-fire-test-requirements\/"},"author":{"name":"admin","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1"},"headline":"Blowout preventer hoses exceed fire test requirements","datePublished":"2019-09-05T08:00:54+00:00","mainEntityOfPage":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/blowout-preventer-hoses-exceed-fire-test-requirements\/"},"wordCount":285,"image":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/blowout-preventer-hoses-exceed-fire-test-requirements\/#primaryimage"},"thumbnailUrl":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2019\/09\/EH11695-Eaton-BOP-hose.jpg","keywords":["Blowout preventer hoses","Eaton"],"articleSection":["Oil &amp; Gas"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/blowout-preventer-hoses-exceed-fire-test-requirements\/","url":"https:\/\/www.engineernewsnetwork.com\/blog\/blowout-preventer-hoses-exceed-fire-test-requirements\/","name":"Blowout preventer hoses exceed fire test requirements - Engineer News Network","isPartOf":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/blowout-preventer-hoses-exceed-fire-test-requirements\/#primaryimage"},"image":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/blowout-preventer-hoses-exceed-fire-test-requirements\/#primaryimage"},"thumbnailUrl":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2019\/09\/EH11695-Eaton-BOP-hose.jpg","datePublished":"2019-09-05T08:00:54+00:00","author":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1"},"description":"Power management company Eaton today announces an extension to its range of blowout preventer (BOP) hoses, which meet the requirements of the demanding API 16D 2nd Edition drill well specification","breadcrumb":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/blowout-preventer-hoses-exceed-fire-test-requirements\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.engineernewsnetwork.com\/blog\/blowout-preventer-hoses-exceed-fire-test-requirements\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/blowout-preventer-hoses-exceed-fire-test-requirements\/#primaryimage","url":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2019\/09\/EH11695-Eaton-BOP-hose.jpg","contentUrl":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2019\/09\/EH11695-Eaton-BOP-hose.jpg","width":945,"height":156,"caption":"The Eaton EC556 BOP hose"},{"@type":"BreadcrumbList","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/blowout-preventer-hoses-exceed-fire-test-requirements\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.engineernewsnetwork.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Blowout preventer hoses exceed fire test requirements"}]},{"@type":"WebSite","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#website","url":"https:\/\/www.engineernewsnetwork.com\/blog\/","name":"Engineer News Network","description":"The ultimate online news and information resource for today's engineer","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.engineernewsnetwork.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Person","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1","name":"admin","url":"https:\/\/www.engineernewsnetwork.com\/blog\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts\/14026","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/comments?post=14026"}],"version-history":[{"count":1,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts\/14026\/revisions"}],"predecessor-version":[{"id":14030,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts\/14026\/revisions\/14030"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/media\/14027"}],"wp:attachment":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/media?parent=14026"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/categories?post=14026"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/tags?post=14026"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}