{"id":15089,"date":"2019-12-19T09:00:00","date_gmt":"2019-12-19T09:00:00","guid":{"rendered":"https:\/\/www.engineernewsnetwork.com\/blog\/?p=15089"},"modified":"2019-12-18T17:20:50","modified_gmt":"2019-12-18T17:20:50","slug":"how-automation-reduces-cable-assembly-lead-time-to-24-hours","status":"publish","type":"post","link":"https:\/\/www.engineernewsnetwork.com\/blog\/how-automation-reduces-cable-assembly-lead-time-to-24-hours\/","title":{"rendered":"How automation reduces cable assembly lead time to 24 hours"},"content":{"rendered":"\n<p>The igus assembly line for readycable at its UK facility in Northampton uses fully-automated machines and lean manufacturing methods to streamline its assembly process to deliver fully-harnessed drive cables shipped within 24 hours of order placement.<\/p>\n\n\n\n<p>\u00a0The five-step process to a readycable starts with automatically stripping off the jacket, then the shielding is loosened, and inner cores exposed ready for crimping.\u00a0<\/p>\n\n\n\n<p>The strip and crimp machine turns a process that once took even the most experienced assembly worker up to a minute to crimp each core to less than a second.&nbsp;<\/p>\n\n\n\n<p>By automating these time consuming and laborious processes, igus now also gives 100% quality of assembly.<\/p>\n\n\n\n<p>igus supports all major drives technologies and chainflex cable is cut to length from the extensive stock held in Northampton.&nbsp;<\/p>\n\n\n\n<p>As most customers requiring drive cables would also want power, igus has also added a power cable assembly line, which uses a similar five-step process.<\/p>\n\n\n\n<p>Upon order, the customer&#8217;s readycable will be shipped with 24 hours, fully-tested and manufactured using high quality chainflex cables.\u00a0<\/p>\n\n\n\n<p>To look at the readycable assembly line in action, click <strong><a href=\"http:\/\/www.igus.co.uk\/readycableassemblyVOTW\" target=\"_blank\" rel=\"noreferrer noopener\" aria-label=\" (opens in a new tab)\">HERE<\/a><\/strong>. <\/p>\n","protected":false},"excerpt":{"rendered":"<p>The igus assembly line for readycable at its UK facility in Northampton uses fully-automated machines and lean manufacturing methods to streamline its assembly process to deliver fully-harnessed drive cables shipped within 24 hours of order placement. \u00a0The five-step process to a readycable starts with automatically stripping off the jacket, then the shielding is loosened, and &hellip;<\/p>\n","protected":false},"author":1,"featured_media":15090,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[105],"tags":[48,7623,227],"class_list":["post-15089","post","type-post","status-publish","format-standard","has-post-thumbnail","","category-design","tag-automation","tag-cable-assembly","tag-igus"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>How automation reduces cable assembly lead time to 24 hours - Engineer News Network<\/title>\n<meta name=\"description\" content=\"The igus assembly line for readycable at its UK facility in Northampton uses fully-automated machines and lean manufacturing methods to streamline its assembly process to deliver fully-harnessed drive cables shipped within 24 hours of order placement\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.engineernewsnetwork.com\/blog\/how-automation-reduces-cable-assembly-lead-time-to-24-hours\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How automation reduces cable assembly lead time to 24 hours - Engineer News Network\" \/>\n<meta property=\"og:description\" content=\"The igus assembly line for readycable at its UK facility in Northampton uses fully-automated machines and lean manufacturing methods to streamline its assembly process to deliver fully-harnessed drive cables shipped within 24 hours of order placement\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.engineernewsnetwork.com\/blog\/how-automation-reduces-cable-assembly-lead-time-to-24-hours\/\" \/>\n<meta property=\"og:site_name\" content=\"Engineer News Network\" \/>\n<meta property=\"article:published_time\" content=\"2019-12-19T09:00:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2019\/12\/IGV039-readycable-automated-assembly-line-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/how-automation-reduces-cable-assembly-lead-time-to-24-hours\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/how-automation-reduces-cable-assembly-lead-time-to-24-hours\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1\"},\"headline\":\"How automation reduces cable assembly lead time to 24 hours\",\"datePublished\":\"2019-12-19T09:00:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/how-automation-reduces-cable-assembly-lead-time-to-24-hours\/\"},\"wordCount\":190,\"image\":{\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/how-automation-reduces-cable-assembly-lead-time-to-24-hours\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2019\/12\/IGV039-readycable-automated-assembly-line-scaled.jpg\",\"keywords\":[\"automation\",\"cable assembly\",\"igus\"],\"articleSection\":[\"Design\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/how-automation-reduces-cable-assembly-lead-time-to-24-hours\/\",\"url\":\"https:\/\/www.engineernewsnetwork.com\/blog\/how-automation-reduces-cable-assembly-lead-time-to-24-hours\/\",\"name\":\"How automation reduces cable assembly lead time to 24 hours - Engineer News Network\",\"isPartOf\":{\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/how-automation-reduces-cable-assembly-lead-time-to-24-hours\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/how-automation-reduces-cable-assembly-lead-time-to-24-hours\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2019\/12\/IGV039-readycable-automated-assembly-line-scaled.jpg\",\"datePublished\":\"2019-12-19T09:00:00+00:00\",\"author\":{\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1\"},\"description\":\"The igus assembly line for readycable at its UK facility in Northampton uses fully-automated machines and lean manufacturing methods to streamline its assembly process to deliver fully-harnessed drive cables shipped within 24 hours of order placement\",\"breadcrumb\":{\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/how-automation-reduces-cable-assembly-lead-time-to-24-hours\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.engineernewsnetwork.com\/blog\/how-automation-reduces-cable-assembly-lead-time-to-24-hours\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/how-automation-reduces-cable-assembly-lead-time-to-24-hours\/#primaryimage\",\"url\":\"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2019\/12\/IGV039-readycable-automated-assembly-line-scaled.jpg\",\"contentUrl\":\"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2019\/12\/IGV039-readycable-automated-assembly-line-scaled.jpg\",\"width\":2560,\"height\":1707,\"caption\":\"The five-step process to a readycable starts with automatically stripping off the jacket, then the shielding is loosened, and inner cores exposed ready for crimping\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/how-automation-reduces-cable-assembly-lead-time-to-24-hours\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.engineernewsnetwork.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How automation reduces cable assembly lead time to 24 hours\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/#website\",\"url\":\"https:\/\/www.engineernewsnetwork.com\/blog\/\",\"name\":\"Engineer News Network\",\"description\":\"The ultimate online news and information resource for today's engineer\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.engineernewsnetwork.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1\",\"name\":\"admin\",\"url\":\"https:\/\/www.engineernewsnetwork.com\/blog\/author\/admin\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"How automation reduces cable assembly lead time to 24 hours - Engineer News Network","description":"The igus assembly line for readycable at its UK facility in Northampton uses fully-automated machines and lean manufacturing methods to streamline its assembly process to deliver fully-harnessed drive cables shipped within 24 hours of order placement","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.engineernewsnetwork.com\/blog\/how-automation-reduces-cable-assembly-lead-time-to-24-hours\/","og_locale":"en_GB","og_type":"article","og_title":"How automation reduces cable assembly lead time to 24 hours - Engineer News Network","og_description":"The igus assembly line for readycable at its UK facility in Northampton uses fully-automated machines and lean manufacturing methods to streamline its assembly process to deliver fully-harnessed drive cables shipped within 24 hours of order placement","og_url":"https:\/\/www.engineernewsnetwork.com\/blog\/how-automation-reduces-cable-assembly-lead-time-to-24-hours\/","og_site_name":"Engineer News Network","article_published_time":"2019-12-19T09:00:00+00:00","og_image":[{"width":2560,"height":1707,"url":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2019\/12\/IGV039-readycable-automated-assembly-line-scaled.jpg","type":"image\/jpeg"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Estimated reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/how-automation-reduces-cable-assembly-lead-time-to-24-hours\/#article","isPartOf":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/how-automation-reduces-cable-assembly-lead-time-to-24-hours\/"},"author":{"name":"admin","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1"},"headline":"How automation reduces cable assembly lead time to 24 hours","datePublished":"2019-12-19T09:00:00+00:00","mainEntityOfPage":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/how-automation-reduces-cable-assembly-lead-time-to-24-hours\/"},"wordCount":190,"image":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/how-automation-reduces-cable-assembly-lead-time-to-24-hours\/#primaryimage"},"thumbnailUrl":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2019\/12\/IGV039-readycable-automated-assembly-line-scaled.jpg","keywords":["automation","cable assembly","igus"],"articleSection":["Design"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/how-automation-reduces-cable-assembly-lead-time-to-24-hours\/","url":"https:\/\/www.engineernewsnetwork.com\/blog\/how-automation-reduces-cable-assembly-lead-time-to-24-hours\/","name":"How automation reduces cable assembly lead time to 24 hours - Engineer News Network","isPartOf":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/how-automation-reduces-cable-assembly-lead-time-to-24-hours\/#primaryimage"},"image":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/how-automation-reduces-cable-assembly-lead-time-to-24-hours\/#primaryimage"},"thumbnailUrl":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2019\/12\/IGV039-readycable-automated-assembly-line-scaled.jpg","datePublished":"2019-12-19T09:00:00+00:00","author":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1"},"description":"The igus assembly line for readycable at its UK facility in Northampton uses fully-automated machines and lean manufacturing methods to streamline its assembly process to deliver fully-harnessed drive cables shipped within 24 hours of order placement","breadcrumb":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/how-automation-reduces-cable-assembly-lead-time-to-24-hours\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.engineernewsnetwork.com\/blog\/how-automation-reduces-cable-assembly-lead-time-to-24-hours\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/how-automation-reduces-cable-assembly-lead-time-to-24-hours\/#primaryimage","url":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2019\/12\/IGV039-readycable-automated-assembly-line-scaled.jpg","contentUrl":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2019\/12\/IGV039-readycable-automated-assembly-line-scaled.jpg","width":2560,"height":1707,"caption":"The five-step process to a readycable starts with automatically stripping off the jacket, then the shielding is loosened, and inner cores exposed ready for crimping"},{"@type":"BreadcrumbList","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/how-automation-reduces-cable-assembly-lead-time-to-24-hours\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.engineernewsnetwork.com\/blog\/"},{"@type":"ListItem","position":2,"name":"How automation reduces cable assembly lead time to 24 hours"}]},{"@type":"WebSite","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#website","url":"https:\/\/www.engineernewsnetwork.com\/blog\/","name":"Engineer News Network","description":"The ultimate online news and information resource for today's engineer","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.engineernewsnetwork.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Person","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1","name":"admin","url":"https:\/\/www.engineernewsnetwork.com\/blog\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts\/15089","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/comments?post=15089"}],"version-history":[{"count":2,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts\/15089\/revisions"}],"predecessor-version":[{"id":15092,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts\/15089\/revisions\/15092"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/media\/15090"}],"wp:attachment":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/media?parent=15089"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/categories?post=15089"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/tags?post=15089"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}