{"id":16483,"date":"2020-05-04T08:00:00","date_gmt":"2020-05-04T07:00:00","guid":{"rendered":"https:\/\/www.engineernewsnetwork.com\/blog\/?p=16483"},"modified":"2020-04-30T09:49:36","modified_gmt":"2020-04-30T08:49:36","slug":"50-more-space-in-distribution-boxes-with-new-switches","status":"publish","type":"post","link":"https:\/\/www.engineernewsnetwork.com\/blog\/50-more-space-in-distribution-boxes-with-new-switches\/","title":{"rendered":"50% more space in distribution boxes with new switches"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong><a href=\"http:\/\/conrad.com\" target=\"_blank\" rel=\"noreferrer noopener\">Conrad Electronic<\/a><\/strong> extends its product range with the recently introduced 5SV1 RCBO (FI\/LS) switches from Siemens, expanding its professional assortment in the building technology sector.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&#8220;Since March 2019, we fully integrated the complete range of the Siemens into our product range. This gives our business customers, primarily in maintenance and repair (MRO), access to a wide range of products and system solutions from the automation, drives, installation and industrial switching technology sectors,\u201d says Martin Merkl, Product Manager at Conrad Electronic. &#8220;With Siemens\u2019 5SV1 RCBOs, we are now expanding our extensive building technology range, especially for use in residential areas and new construction sites.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The new devices are the world&#8217;s first electromechanical RCBOs that are independent of mains voltage, combine residual current and overload protection in one housing and utilise only one dividing unit (1 HP), and require only half the space when compared with conventional installations. This means that more protective devices can be installed in a distribution box than before, and existing installations can be extended with new protective functions easily while saving space.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The compact 5SV1 RCBOs protect people from dangerous electric shocks and at the same time prevent overcurrent damage to cables and failure of electrical systems and devices in buildings, infrastructure, and industry.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In the event of a fault, they reliably and safely disconnect the respective circuit from the mains power.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The 5SV1 RCBO switches are available in six versions for 2, 4, 6, 10, 13 and 16A\/30mA or 6 kA.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In combination with a 5SM6 fire protection switch block, the 5SV1 RCBOs offer personal, line and preventive fire protection in just 2 HP. The switches are certified for use in Europe and all other IEC countries.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Another advantage of the 5SV1 RCBOs is the higher operational availability of electrical installations through multiple RCBO combinations, because, unlike with group RCDs, only the corresponding circuit is interrupted. This prevents unwanted switching-off of further circuits.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Conrad Electronic extends its product range with the recently introduced 5SV1 RCBO (FI\/LS) switches from Siemens, expanding its professional assortment in the building technology sector. &#8220;Since March 2019, we fully integrated the complete range of the Siemens into our product range. This gives our business customers, primarily in maintenance and repair (MRO), access to a &hellip;<\/p>\n","protected":false},"author":1,"featured_media":16484,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[104],"tags":[8192,1842],"class_list":["post-16483","post","type-post","status-publish","format-standard","has-post-thumbnail","","category-electronics","tag-rcbo-switches","tag-siemens"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>50% more space in distribution boxes with new switches - Engineer News Network<\/title>\n<meta name=\"description\" content=\"Combined with the 5SM6 fire protection switch block, personal, line and preventive fire protection can be implemented in just 2 HP\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.engineernewsnetwork.com\/blog\/50-more-space-in-distribution-boxes-with-new-switches\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"50% more space in distribution boxes with new switches - Engineer News Network\" \/>\n<meta property=\"og:description\" content=\"Combined with the 5SM6 fire protection switch block, personal, line and preventive fire protection can be implemented in just 2 HP\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.engineernewsnetwork.com\/blog\/50-more-space-in-distribution-boxes-with-new-switches\/\" \/>\n<meta property=\"og:site_name\" content=\"Engineer News Network\" \/>\n<meta property=\"article:published_time\" content=\"2020-05-04T07:00:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2020\/04\/CRD606A_Siemens_5SV1_FI_LS_switches_HRES.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1104\" \/>\n\t<meta property=\"og:image:height\" content=\"444\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/50-more-space-in-distribution-boxes-with-new-switches\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/50-more-space-in-distribution-boxes-with-new-switches\\\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/#\\\/schema\\\/person\\\/4477342aea8e299c6a21761e513ea8e1\"},\"headline\":\"50% more space in distribution boxes with new switches\",\"datePublished\":\"2020-05-04T07:00:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/50-more-space-in-distribution-boxes-with-new-switches\\\/\"},\"wordCount\":319,\"image\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/50-more-space-in-distribution-boxes-with-new-switches\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/wp-content\\\/uploads\\\/2020\\\/04\\\/CRD606A_Siemens_5SV1_FI_LS_switches_HRES.jpg\",\"keywords\":[\"RCBO switches\",\"Siemens\"],\"articleSection\":[\"Electronics\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/50-more-space-in-distribution-boxes-with-new-switches\\\/\",\"url\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/50-more-space-in-distribution-boxes-with-new-switches\\\/\",\"name\":\"50% more space in distribution boxes with new switches - Engineer News Network\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/50-more-space-in-distribution-boxes-with-new-switches\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/50-more-space-in-distribution-boxes-with-new-switches\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/wp-content\\\/uploads\\\/2020\\\/04\\\/CRD606A_Siemens_5SV1_FI_LS_switches_HRES.jpg\",\"datePublished\":\"2020-05-04T07:00:00+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/#\\\/schema\\\/person\\\/4477342aea8e299c6a21761e513ea8e1\"},\"description\":\"Combined with the 5SM6 fire protection switch block, personal, line and preventive fire protection can be implemented in just 2 HP\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/50-more-space-in-distribution-boxes-with-new-switches\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/50-more-space-in-distribution-boxes-with-new-switches\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/50-more-space-in-distribution-boxes-with-new-switches\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/wp-content\\\/uploads\\\/2020\\\/04\\\/CRD606A_Siemens_5SV1_FI_LS_switches_HRES.jpg\",\"contentUrl\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/wp-content\\\/uploads\\\/2020\\\/04\\\/CRD606A_Siemens_5SV1_FI_LS_switches_HRES.jpg\",\"width\":1104,\"height\":444,\"caption\":\"The 5SV1 RCBO switches from Siemens, which are only 1 HP wide. Image: Siemens\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/50-more-space-in-distribution-boxes-with-new-switches\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"50% more space in distribution boxes with new switches\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/\",\"name\":\"Engineer News Network\",\"description\":\"The ultimate online news and information resource for today's engineer\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/#\\\/schema\\\/person\\\/4477342aea8e299c6a21761e513ea8e1\",\"name\":\"admin\",\"url\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/author\\\/admin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"50% more space in distribution boxes with new switches - Engineer News Network","description":"Combined with the 5SM6 fire protection switch block, personal, line and preventive fire protection can be implemented in just 2 HP","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.engineernewsnetwork.com\/blog\/50-more-space-in-distribution-boxes-with-new-switches\/","og_locale":"en_GB","og_type":"article","og_title":"50% more space in distribution boxes with new switches - Engineer News Network","og_description":"Combined with the 5SM6 fire protection switch block, personal, line and preventive fire protection can be implemented in just 2 HP","og_url":"https:\/\/www.engineernewsnetwork.com\/blog\/50-more-space-in-distribution-boxes-with-new-switches\/","og_site_name":"Engineer News Network","article_published_time":"2020-05-04T07:00:00+00:00","og_image":[{"width":1104,"height":444,"url":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2020\/04\/CRD606A_Siemens_5SV1_FI_LS_switches_HRES.jpg","type":"image\/jpeg"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Estimated reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/50-more-space-in-distribution-boxes-with-new-switches\/#article","isPartOf":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/50-more-space-in-distribution-boxes-with-new-switches\/"},"author":{"name":"admin","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1"},"headline":"50% more space in distribution boxes with new switches","datePublished":"2020-05-04T07:00:00+00:00","mainEntityOfPage":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/50-more-space-in-distribution-boxes-with-new-switches\/"},"wordCount":319,"image":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/50-more-space-in-distribution-boxes-with-new-switches\/#primaryimage"},"thumbnailUrl":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2020\/04\/CRD606A_Siemens_5SV1_FI_LS_switches_HRES.jpg","keywords":["RCBO switches","Siemens"],"articleSection":["Electronics"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/50-more-space-in-distribution-boxes-with-new-switches\/","url":"https:\/\/www.engineernewsnetwork.com\/blog\/50-more-space-in-distribution-boxes-with-new-switches\/","name":"50% more space in distribution boxes with new switches - Engineer News Network","isPartOf":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/50-more-space-in-distribution-boxes-with-new-switches\/#primaryimage"},"image":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/50-more-space-in-distribution-boxes-with-new-switches\/#primaryimage"},"thumbnailUrl":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2020\/04\/CRD606A_Siemens_5SV1_FI_LS_switches_HRES.jpg","datePublished":"2020-05-04T07:00:00+00:00","author":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1"},"description":"Combined with the 5SM6 fire protection switch block, personal, line and preventive fire protection can be implemented in just 2 HP","breadcrumb":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/50-more-space-in-distribution-boxes-with-new-switches\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.engineernewsnetwork.com\/blog\/50-more-space-in-distribution-boxes-with-new-switches\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/50-more-space-in-distribution-boxes-with-new-switches\/#primaryimage","url":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2020\/04\/CRD606A_Siemens_5SV1_FI_LS_switches_HRES.jpg","contentUrl":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2020\/04\/CRD606A_Siemens_5SV1_FI_LS_switches_HRES.jpg","width":1104,"height":444,"caption":"The 5SV1 RCBO switches from Siemens, which are only 1 HP wide. Image: Siemens"},{"@type":"BreadcrumbList","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/50-more-space-in-distribution-boxes-with-new-switches\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.engineernewsnetwork.com\/blog\/"},{"@type":"ListItem","position":2,"name":"50% more space in distribution boxes with new switches"}]},{"@type":"WebSite","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#website","url":"https:\/\/www.engineernewsnetwork.com\/blog\/","name":"Engineer News Network","description":"The ultimate online news and information resource for today's engineer","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.engineernewsnetwork.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Person","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1","name":"admin","url":"https:\/\/www.engineernewsnetwork.com\/blog\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts\/16483","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/comments?post=16483"}],"version-history":[{"count":1,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts\/16483\/revisions"}],"predecessor-version":[{"id":16485,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts\/16483\/revisions\/16485"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/media\/16484"}],"wp:attachment":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/media?parent=16483"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/categories?post=16483"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/tags?post=16483"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}