{"id":20040,"date":"2021-09-10T10:22:41","date_gmt":"2021-09-10T09:22:41","guid":{"rendered":"https:\/\/www.engineernewsnetwork.com\/blog\/?p=20040"},"modified":"2021-09-10T10:23:29","modified_gmt":"2021-09-10T09:23:29","slug":"overcoming-the-standard-parts-and-components-stock-shortage","status":"publish","type":"post","link":"https:\/\/www.engineernewsnetwork.com\/blog\/overcoming-the-standard-parts-and-components-stock-shortage\/","title":{"rendered":"Overcoming the standard parts and components stock shortage"},"content":{"rendered":"\n<p><strong>As Covid and Brexit hit UK imports &#8211; standard parts and components included &#8211; OEMs have been forced to respond. Component delays have impacted time to market and availability of existing OEM-designed products, requiring alternate supply channels or even re-specification and re-design. But OEMs can be reassured by component suppliers that combine UK manufacture with a robust stocking model, as WDS announces its stock guarantee programme. Mark Moody explains why OEMs can retain confidence in component supply despite ongoing challenges&nbsp;<\/strong><\/p>\n\n\n\n<p>With varying levels of impact, OEMs, ranging from machine builders to consumer goods manufacturers, have suffered from parts shortages and delays over the past 18 months. Combining the effects of Covid and Brexit, imports from EU countries fell by 21.7% between quarter four 2020 and quarter one 2021, as well as a 1% fall from non-EU countries, according to the National Office of Statistics (ONS)1.<\/p>\n\n\n\n<p>Supply from China has taken up a lot of the shortfall, with the ONS reporting a massive increase of over 40% across all imports throughout 2020. While this is significant for the standard parts and components market, China being the major global supplier, this increase hasn\u2019t alleviated shortages or delays. In January 2021, the number of weekly cargo and tanker ship visits to UK ports was over 20% lower than the year before, according to the ONS.<\/p>\n\n\n\n<p>Furthermore, the challenges facing global shipping do not appear to be going away. CNBC news recently reported that waiting times for vessels to berth at Yantian\u2019s port, one of China\u2019s most important, have increased from an average waiting time of half a day to 16 days2. In addition to the blockage of the Suez Canal, the <em>Financial Times<\/em> reported in August that the pandemic has brought the biggest disruption since the start of container shipping 65 years ago3.<\/p>\n\n\n\n<p>In practical terms for UK OEMs, this has meant both delays and price rises. The report <em>The impacts of Covid-19 and Brexit on the UK economy: early evidence in 2021<\/em> by The London School of Economics\u2019 Centre for Economic Performance, says that nearly 40% of UK businesses have faced a delay in stock, and a third have reported a rise in prices or costs4. Even concentrating only on imports from outside of the EU, the Financial Times says that there are currently 353 container ships stuck outside ports around the world, more than double the number from earlier in the year. Significantly for the standard parts and components market, the vast majority of these are found offshore of China and the far east.<\/p>\n\n\n\n<p>Unsurprisingly then, confidence in the supply of standard parts and components has been impacted, particularly for OEMs and designers who commonly require a high volume. But for WDS, the issue is more about tackling the perception of stock challenges and delays in fulfilment, than any actual stock shortfalls. WDS has onsite manufacturing at its Leeds plant and a large distribution centre houses extensive stocks with a wide range of components, parts and machine accessories. The full-scale manufacturing operation, which includes on-site R&amp;D, is also supported by a robust supply network.<\/p>\n\n\n\n<p>As a result, the component supply specialist has launched a unique stock guarantee offer that provides a 10% price discount if it doesn\u2019t hold the specified item in stock for the quantity required. In practical terms, this means that if 1,000 items are required and 950 are available, a 10% credit will be applied to the required 50 items. More than a thousand products are already included in the deal, assuring customers of availability with same day despatch, and products are being added frequently with announcements through the WDS social media channels.<\/p>\n\n\n\n<p>To identify if the required item is covered by the availability assurance, a \u2018stock guarantee\u2019 column has been added to the product table, displayed for each individual product page on wdscomponents.com. WDS carries a catalogue of over 25,000 parts, ranging from machine and hardware to jig and fixture.<\/p>\n\n\n\n<p>The global market of standard parts and components is likely to face continued supply issues into the coming months. Like any business that relies on an extent of goods imports, WDS isn\u2019t immune. However, onsite manufacturing and a large scale supply chain with extensive stocking facilities mean that customers\u2019 design and manufacturing production plans can remain on schedule. The stock guarantee programme provides this assurance.<\/p>\n\n\n\n<p>Mark Moody is Sales &amp; Marketing Director, WDS Components Ltd. www.wdscomponents.com<\/p>\n\n\n\n<p>1. The impacts of EU exit and the coronavirus on UK trade in goods, ONS, <strong><a href=\"https:\/\/www.ons.gov.uk\/businessindustryandtrade\/internationaltrade\/articles\/theimpactsofeuexitandthecoronavirusonuktradeingoods\/2021-05-25#trade-of-goods-with-eu-countries\" target=\"_blank\" rel=\"noreferrer noopener\">https:\/\/www.ons.gov.uk\/businessindustryandtrade\/internationaltrade\/articles\/theimpactsofeuexitandthecoronavirusonuktradeingoods\/2021-05-25#trade-of-goods-with-eu-countries<\/a><\/strong><\/p>\n\n\n\n<p>2. <strong><a href=\"https:\/\/www.cnbc.com\/2021\/06\/15\/china-covid-cases-causing-higher-shipping-costs-delayed-goods.html\" target=\"_blank\" rel=\"noreferrer noopener\">https:\/\/www.cnbc.com\/2021\/06\/15\/china-covid-cases-causing-higher-shipping-costs-delayed-goods.html<\/a><\/strong><\/p>\n\n\n\n<p>3. <strong><a href=\"https:\/\/www.ft.com\/content\/10e71eff-e59c-46fb-a9aa-a480bc86c093\" target=\"_blank\" rel=\"noreferrer noopener\">https:\/\/www.ft.com\/content\/10e71eff-e59c-46fb-a9aa-a480bc86c093<\/a><\/strong><\/p>\n\n\n\n<p>4. The London School of Economics\u2019 Centre for Economic Performance report, <em>The impacts of Covid-19 and Brexit on the UK economy: early evidence in 2021<\/em>: <strong><a href=\"https:\/\/cep.lse.ac.uk\/pubs\/download\/cepcovid-19-021.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">https:\/\/cep.lse.ac.uk\/pubs\/download\/cepcovid-19-021.pdf<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>As Covid and Brexit hit UK imports &#8211; standard parts and components included &#8211; OEMs have been forced to respond. Component delays have impacted time to market and availability of existing OEM-designed products, requiring alternate supply channels or even re-specification and re-design. But OEMs can be reassured by component suppliers that combine UK manufacture with &hellip;<\/p>\n","protected":false},"author":1,"featured_media":20041,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[199],"tags":[9564,9565],"class_list":["post-20040","post","type-post","status-publish","format-standard","has-post-thumbnail","","category-news-views-and-opinion","tag-stock-shortages","tag-wds-components-ltd"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Overcoming the standard parts and components stock shortage - Engineer News Network<\/title>\n<meta name=\"description\" content=\"Mark Moody explains why OEMs can retain confidence in component supply despite ongoing challenges\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.engineernewsnetwork.com\/blog\/overcoming-the-standard-parts-and-components-stock-shortage\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Overcoming the standard parts and components stock shortage - Engineer News Network\" \/>\n<meta property=\"og:description\" content=\"Mark Moody explains why OEMs can retain confidence in component supply despite ongoing challenges\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.engineernewsnetwork.com\/blog\/overcoming-the-standard-parts-and-components-stock-shortage\/\" \/>\n<meta property=\"og:site_name\" content=\"Engineer News Network\" \/>\n<meta property=\"article:published_time\" content=\"2021-09-10T09:22:41+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-09-10T09:23:29+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2021\/09\/WDS241_Stock_Guaranteed_pic1_PR6757_49706.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2000\" \/>\n\t<meta property=\"og:image:height\" content=\"1050\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/overcoming-the-standard-parts-and-components-stock-shortage\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/overcoming-the-standard-parts-and-components-stock-shortage\\\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/#\\\/schema\\\/person\\\/4477342aea8e299c6a21761e513ea8e1\"},\"headline\":\"Overcoming the standard parts and components stock shortage\",\"datePublished\":\"2021-09-10T09:22:41+00:00\",\"dateModified\":\"2021-09-10T09:23:29+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/overcoming-the-standard-parts-and-components-stock-shortage\\\/\"},\"wordCount\":805,\"image\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/overcoming-the-standard-parts-and-components-stock-shortage\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/wp-content\\\/uploads\\\/2021\\\/09\\\/WDS241_Stock_Guaranteed_pic1_PR6757_49706.jpg\",\"keywords\":[\"stock shortages\",\"WDS Components Ltd\"],\"articleSection\":[\"News, Views and Opinion\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/overcoming-the-standard-parts-and-components-stock-shortage\\\/\",\"url\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/overcoming-the-standard-parts-and-components-stock-shortage\\\/\",\"name\":\"Overcoming the standard parts and components stock shortage - Engineer News Network\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/overcoming-the-standard-parts-and-components-stock-shortage\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/overcoming-the-standard-parts-and-components-stock-shortage\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/wp-content\\\/uploads\\\/2021\\\/09\\\/WDS241_Stock_Guaranteed_pic1_PR6757_49706.jpg\",\"datePublished\":\"2021-09-10T09:22:41+00:00\",\"dateModified\":\"2021-09-10T09:23:29+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/#\\\/schema\\\/person\\\/4477342aea8e299c6a21761e513ea8e1\"},\"description\":\"Mark Moody explains why OEMs can retain confidence in component supply despite ongoing challenges\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/overcoming-the-standard-parts-and-components-stock-shortage\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/overcoming-the-standard-parts-and-components-stock-shortage\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/overcoming-the-standard-parts-and-components-stock-shortage\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/wp-content\\\/uploads\\\/2021\\\/09\\\/WDS241_Stock_Guaranteed_pic1_PR6757_49706.jpg\",\"contentUrl\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/wp-content\\\/uploads\\\/2021\\\/09\\\/WDS241_Stock_Guaranteed_pic1_PR6757_49706.jpg\",\"width\":2000,\"height\":1050,\"caption\":\"With varying levels of impact, OEMs, ranging from machine builders to consumer goods manufacturers, have suffered from parts shortages and delays over the past 18 month\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/overcoming-the-standard-parts-and-components-stock-shortage\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Overcoming the standard parts and components stock shortage\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/\",\"name\":\"Engineer News Network\",\"description\":\"The ultimate online news and information resource for today's engineer\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/#\\\/schema\\\/person\\\/4477342aea8e299c6a21761e513ea8e1\",\"name\":\"admin\",\"url\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/author\\\/admin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Overcoming the standard parts and components stock shortage - Engineer News Network","description":"Mark Moody explains why OEMs can retain confidence in component supply despite ongoing challenges","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.engineernewsnetwork.com\/blog\/overcoming-the-standard-parts-and-components-stock-shortage\/","og_locale":"en_GB","og_type":"article","og_title":"Overcoming the standard parts and components stock shortage - Engineer News Network","og_description":"Mark Moody explains why OEMs can retain confidence in component supply despite ongoing challenges","og_url":"https:\/\/www.engineernewsnetwork.com\/blog\/overcoming-the-standard-parts-and-components-stock-shortage\/","og_site_name":"Engineer News Network","article_published_time":"2021-09-10T09:22:41+00:00","article_modified_time":"2021-09-10T09:23:29+00:00","og_image":[{"width":2000,"height":1050,"url":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2021\/09\/WDS241_Stock_Guaranteed_pic1_PR6757_49706.jpg","type":"image\/jpeg"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Estimated reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/overcoming-the-standard-parts-and-components-stock-shortage\/#article","isPartOf":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/overcoming-the-standard-parts-and-components-stock-shortage\/"},"author":{"name":"admin","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1"},"headline":"Overcoming the standard parts and components stock shortage","datePublished":"2021-09-10T09:22:41+00:00","dateModified":"2021-09-10T09:23:29+00:00","mainEntityOfPage":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/overcoming-the-standard-parts-and-components-stock-shortage\/"},"wordCount":805,"image":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/overcoming-the-standard-parts-and-components-stock-shortage\/#primaryimage"},"thumbnailUrl":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2021\/09\/WDS241_Stock_Guaranteed_pic1_PR6757_49706.jpg","keywords":["stock shortages","WDS Components Ltd"],"articleSection":["News, Views and Opinion"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/overcoming-the-standard-parts-and-components-stock-shortage\/","url":"https:\/\/www.engineernewsnetwork.com\/blog\/overcoming-the-standard-parts-and-components-stock-shortage\/","name":"Overcoming the standard parts and components stock shortage - Engineer News Network","isPartOf":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/overcoming-the-standard-parts-and-components-stock-shortage\/#primaryimage"},"image":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/overcoming-the-standard-parts-and-components-stock-shortage\/#primaryimage"},"thumbnailUrl":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2021\/09\/WDS241_Stock_Guaranteed_pic1_PR6757_49706.jpg","datePublished":"2021-09-10T09:22:41+00:00","dateModified":"2021-09-10T09:23:29+00:00","author":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1"},"description":"Mark Moody explains why OEMs can retain confidence in component supply despite ongoing challenges","breadcrumb":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/overcoming-the-standard-parts-and-components-stock-shortage\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.engineernewsnetwork.com\/blog\/overcoming-the-standard-parts-and-components-stock-shortage\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/overcoming-the-standard-parts-and-components-stock-shortage\/#primaryimage","url":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2021\/09\/WDS241_Stock_Guaranteed_pic1_PR6757_49706.jpg","contentUrl":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2021\/09\/WDS241_Stock_Guaranteed_pic1_PR6757_49706.jpg","width":2000,"height":1050,"caption":"With varying levels of impact, OEMs, ranging from machine builders to consumer goods manufacturers, have suffered from parts shortages and delays over the past 18 month"},{"@type":"BreadcrumbList","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/overcoming-the-standard-parts-and-components-stock-shortage\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.engineernewsnetwork.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Overcoming the standard parts and components stock shortage"}]},{"@type":"WebSite","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#website","url":"https:\/\/www.engineernewsnetwork.com\/blog\/","name":"Engineer News Network","description":"The ultimate online news and information resource for today's engineer","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.engineernewsnetwork.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Person","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1","name":"admin","url":"https:\/\/www.engineernewsnetwork.com\/blog\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts\/20040","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/comments?post=20040"}],"version-history":[{"count":2,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts\/20040\/revisions"}],"predecessor-version":[{"id":20043,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts\/20040\/revisions\/20043"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/media\/20041"}],"wp:attachment":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/media?parent=20040"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/categories?post=20040"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/tags?post=20040"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}