{"id":20596,"date":"2021-12-20T09:00:00","date_gmt":"2021-12-20T09:00:00","guid":{"rendered":"https:\/\/www.engineernewsnetwork.com\/blog\/?p=20596"},"modified":"2021-12-16T11:39:09","modified_gmt":"2021-12-16T11:39:09","slug":"designing-generator-packages-for-data-centre-standby-power","status":"publish","type":"post","link":"https:\/\/www.engineernewsnetwork.com\/blog\/designing-generator-packages-for-data-centre-standby-power\/","title":{"rendered":"Designing generator packages for data centre standby power"},"content":{"rendered":"\n<p><strong>In November 2020, a telecommunications company unveiled 20 new data centres across the UK as part of a \u00a32 billion investment. As the number of new sites continues to grow, data centre operators must prepare by having the required backup power systems in place to consistently deliver service. Clinton Noble outlines the key considerations when designing data centre standby power<\/strong><\/p>\n\n\n\n<p>Standby power in data centres is mission-critical \u2014 continuous power prevents outages from damaging mainframes and other IT infrastructure. Having a backup supply also protects customer data that would otherwise be lost, causing financial and reputational damage.<\/p>\n\n\n\n<p>There are several elements in a data centre\u2019s operational power system, including the cooling system, the uninterruptible power supply (UPS) and high voltage (HV) and Low Voltage (LV) switchgear. Diesel generators are a popular choice for these backup power systems because of their reliability, fast response and long runtimes, and because they require minimal maintenance.<\/p>\n\n\n\n<p>It\u2019s good practice to design a genset package and standby power system in accordance with the Uptime Institute. As the internationally-recognised data centre authority, it determines what each site tier requires. For instance, a Tier IV site with maximum resilience must have a continuous cooling capability, unlike a tier III site. There are also other design factors that data centre operators should consider.<\/p>\n\n\n\n<p>Size<\/p>\n\n\n\n<p>Data centres consume large amounts of power and together makeup around one per cent of the world\u2019s total energy consumption, according to the UK Energy Research Centre. When designing a backup generator, the first, and often most important, factor is the power rating. The standby genset must have sufficient power to keep all servers and equipment online during outages.\u00a0<\/p>\n\n\n\n<p>When sizing a generator, the site\u2019s required loads are key. Operators will need to think about start-up currents, terminal voltage, voltage and frequency variations and other factors. It\u2019s also helpful to consider UPS efficiency, lighting and cooling loads and how these will shape the estimated requirements. There are tools available that can determine the right generator size. One example is <strong><a href=\"https:\/\/specsizer.cat.com\/?utm_source=StoneJunction&amp;utm_medium=opinion%2520piece&amp;utm_campaign=FPS056\" target=\"_blank\" rel=\"noreferrer noopener\">SpecSizer<\/a><\/strong>, which can build a load profile and select the optimum genset.<\/p>\n\n\n\n<p>Most data centres, including new sites, have limited floorspace. Operators can overcome this challenge by selecting a generator with a high power density. This is a measure of the number of kilowatts produced in relation to size \u2014 the higher the power density, the greater the output generated in the plant room. High power density generators produce more power from smaller units and require less ancillary equipment than larger machines, reducing installation and servicing costs.&nbsp;<\/p>\n\n\n\n<p><strong>Ambient temperature<\/strong><\/p>\n\n\n\n<p>The climate and ambient temperature inside the data centre are also key. The UK is gradually getting warmer and this can impact genset performance. According to the Met Office\u2019s 2019 State of the UK Climate report, the UK\u2019s average temperature that year was 1.1 degrees Celsius above the levels recorded between 1961 and 1990. Site conditions, including altitude, relative humidity, and variable ambient temperature are all things that designers should consider early on.<\/p>\n\n\n\n<p>If the ambient temperature in a data centre is not as predicted, the genset or the ancillary parts may need redesigning to accommodate the difference. If a data centre becomes too hot or cold, service issues can occur.&nbsp;<\/p>\n\n\n\n<p>Because of these temperature constraints, operators don\u2019t need to worry having a generator with a suitably rated ambient capability. However, they will need a way of removing waste heat that\u2019s produced during power generation. Design options may include minimising the number of enclosures so that cooling air is not restricted and can flow more easily around the generator.&nbsp;<\/p>\n\n\n\n<p><strong>Maintaining uptime<\/strong><\/p>\n\n\n\n<p>Once the new genset and backup power system is installed, carrying out regular preventative maintenance is vital. If a generator fails to start, it\u2019s often due to fuel or battery issues. If the battery\u2019s water levels are low, this can cause damage. Fluids like oil and coolant can also become contaminated, which can lead to engine malfunction and suboptimal performance. For instance, if there\u2019s too many metallic particles in the lube oil, this can cause excessive wear. Contamination rates vary depending on duty cycle, load factor, age and fuel type.&nbsp;<\/p>\n\n\n\n<p>Data centre operators can minimise unplanned downtime by having qualified and experienced service teams on site. These specialists will regularly monitor the battery\u2019s condition by checking the water level and voltage and cleaning and tightening the terminals. They can also check engine fluid levels, take samples of the engine\u2019s fluids and check for contamination with detailed reports and advice issued to the operator.<\/p>\n\n\n\n<p>Carrying out preventative action means data centre operators can spot any issues before they cause engine downtime. This makes it easier to protect sites from outages that would normally cost time and money, as well as prolong the life of their capital investment.<\/p>\n\n\n\n<p>With one telecommunication company alone planning to open 20 data centres, reliable backup power systems will be vital in protecting new sites like these from outages. Data centre operators should think about the design of their gensets and carry out regular preventative maintenance to ensure uptime.<\/p>\n\n\n\n<p>Clinton Noble is Sector Manager for Data Centre Power Solutions at energy and transportation expert <a href=\"https:\/\/www.finning.com\/en_GB\/services\/power-solutions.html?utm_source=StoneJunction&amp;utm_medium=opinion%2520piece&amp;utm_campaign=FPS056\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>Finning UK &amp; Ireland<\/strong><\/a>.\u00a0<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In November 2020, a telecommunications company unveiled 20 new data centres across the UK as part of a \u00a32 billion investment. As the number of new sites continues to grow, data centre operators must prepare by having the required backup power systems in place to consistently deliver service. Clinton Noble outlines the key considerations when &hellip;<\/p>\n","protected":false},"author":1,"featured_media":20597,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[105,199],"tags":[765,7363,6028,9756],"class_list":["post-20596","post","type-post","status-publish","format-standard","has-post-thumbnail","","category-design","category-news-views-and-opinion","tag-data-centres","tag-finning-uk-ireland","tag-generators","tag-standby-power"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Designing generator packages for data centre standby power - Engineer News Network<\/title>\n<meta name=\"description\" content=\"In November 2020, a telecommunications company unveiled 20 new data centres across the UK as part of a \u00a32 billion investment. As the number of new sites continues to grow, data centre operators must prepare by having the required backup power systems in place to consistently deliver service. Clinton Noble outlines the key considerations when designing data centre standby power\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.engineernewsnetwork.com\/blog\/designing-generator-packages-for-data-centre-standby-power\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Designing generator packages for data centre standby power - Engineer News Network\" \/>\n<meta property=\"og:description\" content=\"In November 2020, a telecommunications company unveiled 20 new data centres across the UK as part of a \u00a32 billion investment. As the number of new sites continues to grow, data centre operators must prepare by having the required backup power systems in place to consistently deliver service. Clinton Noble outlines the key considerations when designing data centre standby power\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.engineernewsnetwork.com\/blog\/designing-generator-packages-for-data-centre-standby-power\/\" \/>\n<meta property=\"og:site_name\" content=\"Engineer News Network\" \/>\n<meta property=\"article:published_time\" content=\"2021-12-20T09:00:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2021\/12\/Boston-CHP-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1907\" \/>\n\t<meta property=\"og:image:height\" content=\"2560\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/designing-generator-packages-for-data-centre-standby-power\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/designing-generator-packages-for-data-centre-standby-power\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1\"},\"headline\":\"Designing generator packages for data centre standby power\",\"datePublished\":\"2021-12-20T09:00:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/designing-generator-packages-for-data-centre-standby-power\/\"},\"wordCount\":872,\"image\":{\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/designing-generator-packages-for-data-centre-standby-power\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2021\/12\/Boston-CHP-scaled.jpg\",\"keywords\":[\"data centres\",\"Finning UK &amp; Ireland\",\"generators\",\"standby power\"],\"articleSection\":[\"Design\",\"News, Views and Opinion\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/designing-generator-packages-for-data-centre-standby-power\/\",\"url\":\"https:\/\/www.engineernewsnetwork.com\/blog\/designing-generator-packages-for-data-centre-standby-power\/\",\"name\":\"Designing generator packages for data centre standby power - Engineer News Network\",\"isPartOf\":{\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/designing-generator-packages-for-data-centre-standby-power\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/designing-generator-packages-for-data-centre-standby-power\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2021\/12\/Boston-CHP-scaled.jpg\",\"datePublished\":\"2021-12-20T09:00:00+00:00\",\"author\":{\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1\"},\"description\":\"In November 2020, a telecommunications company unveiled 20 new data centres across the UK as part of a \u00a32 billion investment. As the number of new sites continues to grow, data centre operators must prepare by having the required backup power systems in place to consistently deliver service. Clinton Noble outlines the key considerations when designing data centre standby power\",\"breadcrumb\":{\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/designing-generator-packages-for-data-centre-standby-power\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.engineernewsnetwork.com\/blog\/designing-generator-packages-for-data-centre-standby-power\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/designing-generator-packages-for-data-centre-standby-power\/#primaryimage\",\"url\":\"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2021\/12\/Boston-CHP-scaled.jpg\",\"contentUrl\":\"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2021\/12\/Boston-CHP-scaled.jpg\",\"width\":1907,\"height\":2560,\"caption\":\"What the factors to consider when designing generator packages for use in data centre standby applications\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/designing-generator-packages-for-data-centre-standby-power\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.engineernewsnetwork.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Designing generator packages for data centre standby power\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/#website\",\"url\":\"https:\/\/www.engineernewsnetwork.com\/blog\/\",\"name\":\"Engineer News Network\",\"description\":\"The ultimate online news and information resource for today's engineer\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.engineernewsnetwork.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1\",\"name\":\"admin\",\"url\":\"https:\/\/www.engineernewsnetwork.com\/blog\/author\/admin\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Designing generator packages for data centre standby power - Engineer News Network","description":"In November 2020, a telecommunications company unveiled 20 new data centres across the UK as part of a \u00a32 billion investment. As the number of new sites continues to grow, data centre operators must prepare by having the required backup power systems in place to consistently deliver service. Clinton Noble outlines the key considerations when designing data centre standby power","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.engineernewsnetwork.com\/blog\/designing-generator-packages-for-data-centre-standby-power\/","og_locale":"en_GB","og_type":"article","og_title":"Designing generator packages for data centre standby power - Engineer News Network","og_description":"In November 2020, a telecommunications company unveiled 20 new data centres across the UK as part of a \u00a32 billion investment. As the number of new sites continues to grow, data centre operators must prepare by having the required backup power systems in place to consistently deliver service. Clinton Noble outlines the key considerations when designing data centre standby power","og_url":"https:\/\/www.engineernewsnetwork.com\/blog\/designing-generator-packages-for-data-centre-standby-power\/","og_site_name":"Engineer News Network","article_published_time":"2021-12-20T09:00:00+00:00","og_image":[{"width":1907,"height":2560,"url":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2021\/12\/Boston-CHP-scaled.jpg","type":"image\/jpeg"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Estimated reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/designing-generator-packages-for-data-centre-standby-power\/#article","isPartOf":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/designing-generator-packages-for-data-centre-standby-power\/"},"author":{"name":"admin","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1"},"headline":"Designing generator packages for data centre standby power","datePublished":"2021-12-20T09:00:00+00:00","mainEntityOfPage":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/designing-generator-packages-for-data-centre-standby-power\/"},"wordCount":872,"image":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/designing-generator-packages-for-data-centre-standby-power\/#primaryimage"},"thumbnailUrl":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2021\/12\/Boston-CHP-scaled.jpg","keywords":["data centres","Finning UK &amp; Ireland","generators","standby power"],"articleSection":["Design","News, Views and Opinion"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/designing-generator-packages-for-data-centre-standby-power\/","url":"https:\/\/www.engineernewsnetwork.com\/blog\/designing-generator-packages-for-data-centre-standby-power\/","name":"Designing generator packages for data centre standby power - Engineer News Network","isPartOf":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/designing-generator-packages-for-data-centre-standby-power\/#primaryimage"},"image":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/designing-generator-packages-for-data-centre-standby-power\/#primaryimage"},"thumbnailUrl":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2021\/12\/Boston-CHP-scaled.jpg","datePublished":"2021-12-20T09:00:00+00:00","author":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1"},"description":"In November 2020, a telecommunications company unveiled 20 new data centres across the UK as part of a \u00a32 billion investment. As the number of new sites continues to grow, data centre operators must prepare by having the required backup power systems in place to consistently deliver service. Clinton Noble outlines the key considerations when designing data centre standby power","breadcrumb":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/designing-generator-packages-for-data-centre-standby-power\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.engineernewsnetwork.com\/blog\/designing-generator-packages-for-data-centre-standby-power\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/designing-generator-packages-for-data-centre-standby-power\/#primaryimage","url":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2021\/12\/Boston-CHP-scaled.jpg","contentUrl":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2021\/12\/Boston-CHP-scaled.jpg","width":1907,"height":2560,"caption":"What the factors to consider when designing generator packages for use in data centre standby applications"},{"@type":"BreadcrumbList","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/designing-generator-packages-for-data-centre-standby-power\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.engineernewsnetwork.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Designing generator packages for data centre standby power"}]},{"@type":"WebSite","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#website","url":"https:\/\/www.engineernewsnetwork.com\/blog\/","name":"Engineer News Network","description":"The ultimate online news and information resource for today's engineer","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.engineernewsnetwork.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Person","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1","name":"admin","url":"https:\/\/www.engineernewsnetwork.com\/blog\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts\/20596","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/comments?post=20596"}],"version-history":[{"count":1,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts\/20596\/revisions"}],"predecessor-version":[{"id":20598,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts\/20596\/revisions\/20598"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/media\/20597"}],"wp:attachment":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/media?parent=20596"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/categories?post=20596"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/tags?post=20596"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}