{"id":21633,"date":"2022-05-04T10:31:24","date_gmt":"2022-05-04T09:31:24","guid":{"rendered":"https:\/\/www.engineernewsnetwork.com\/blog\/?p=21633"},"modified":"2022-05-04T10:31:25","modified_gmt":"2022-05-04T09:31:25","slug":"paralleling-switchgear-for-emergency-back-up-power-2","status":"publish","type":"post","link":"https:\/\/www.engineernewsnetwork.com\/blog\/paralleling-switchgear-for-emergency-back-up-power-2\/","title":{"rendered":"Paralleling switchgear for emergency back-up power"},"content":{"rendered":"\n<p>The <strong><a href=\"http:\/\/www.russelectric.com\" target=\"_blank\" rel=\"noreferrer noopener\">Russelectric Emergency Power System<\/a><\/strong> provides back-up power during a utility power loss. The paralleling switchgear systems offer redundant programmable logic controller (PLC) controls and manual backup capability.\u00a0<\/p>\n\n\n\n<p>It has been used by hospitals, data centres, telecommunications and banking facilities, as well as airports, water and wastewater treatment plants, and renewable energy facilities.<\/p>\n\n\n\n<p>Complete systems are custom designed and fully manufactured by Russelectric (a Siemens Business). All systems are UL listed and can incorporate such sophisticated control functions as peak shaving and load curtailment. Russelectric paralleling systems incorporate dual, redundant, hot synchronised PLCs for system control. The unique system design allows manual start and synchronisation of generator sets if automatic controls malfunction. Discrete switches, meters and control devices are standard to allow manual control capability in the event that both system PLCs fail.<\/p>\n\n\n\n<p>Designed for maximum safety and operating simplicity, the systems are supervisory control and data acquisition (SCADA)-capable. A 23-inch LCD HMI touchscreen display enables operators to view system one-line diagrams, alarms, and setpoints.<\/p>\n\n\n\n<p>Load demand sensing determines the number of engine generators in operation based on the loading. The system permits first priority loads to transfer to the connected engine generator set, while delaying the transfer of lower priority loads until additional generator capacity has been connected. Lower priority loads then transfer to the emergency power system as generator sets are added to the bus.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Russelectric Emergency Power System provides back-up power during a utility power loss. The paralleling switchgear systems offer redundant programmable logic controller (PLC) controls and manual backup capability.\u00a0 It has been used by hospitals, data centres, telecommunications and banking facilities, as well as airports, water and wastewater treatment plants, and renewable energy facilities. Complete systems &hellip;<\/p>\n","protected":false},"author":1,"featured_media":21634,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[107],"tags":[10145,3727],"class_list":["post-21633","post","type-post","status-publish","format-standard","has-post-thumbnail","","category-power","tag-emergency-power-system","tag-russelectric"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Paralleling switchgear for emergency back-up power - Engineer News Network<\/title>\n<meta name=\"description\" content=\"Russelectric Emergency Power System offers redundant PLC controls and manual back-up capability\ufeff\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.engineernewsnetwork.com\/blog\/paralleling-switchgear-for-emergency-back-up-power-2\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Paralleling switchgear for emergency back-up power - Engineer News Network\" \/>\n<meta property=\"og:description\" content=\"Russelectric Emergency Power System offers redundant PLC controls and manual back-up capability\ufeff\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.engineernewsnetwork.com\/blog\/paralleling-switchgear-for-emergency-back-up-power-2\/\" \/>\n<meta property=\"og:site_name\" content=\"Engineer News Network\" \/>\n<meta property=\"article:published_time\" content=\"2022-05-04T09:31:24+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-05-04T09:31:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2022\/05\/ParallelingBoard-_1_-_1_.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"807\" \/>\n\t<meta property=\"og:image:height\" content=\"774\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/paralleling-switchgear-for-emergency-back-up-power-2\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/paralleling-switchgear-for-emergency-back-up-power-2\\\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/#\\\/schema\\\/person\\\/4477342aea8e299c6a21761e513ea8e1\"},\"headline\":\"Paralleling switchgear for emergency back-up power\",\"datePublished\":\"2022-05-04T09:31:24+00:00\",\"dateModified\":\"2022-05-04T09:31:25+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/paralleling-switchgear-for-emergency-back-up-power-2\\\/\"},\"wordCount\":234,\"image\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/paralleling-switchgear-for-emergency-back-up-power-2\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/ParallelingBoard-_1_-_1_.jpg\",\"keywords\":[\"Emergency Power System\",\"Russelectric\"],\"articleSection\":[\"Power\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/paralleling-switchgear-for-emergency-back-up-power-2\\\/\",\"url\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/paralleling-switchgear-for-emergency-back-up-power-2\\\/\",\"name\":\"Paralleling switchgear for emergency back-up power - Engineer News Network\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/paralleling-switchgear-for-emergency-back-up-power-2\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/paralleling-switchgear-for-emergency-back-up-power-2\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/ParallelingBoard-_1_-_1_.jpg\",\"datePublished\":\"2022-05-04T09:31:24+00:00\",\"dateModified\":\"2022-05-04T09:31:25+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/#\\\/schema\\\/person\\\/4477342aea8e299c6a21761e513ea8e1\"},\"description\":\"Russelectric Emergency Power System offers redundant PLC controls and manual back-up capability\ufeff\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/paralleling-switchgear-for-emergency-back-up-power-2\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/paralleling-switchgear-for-emergency-back-up-power-2\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/paralleling-switchgear-for-emergency-back-up-power-2\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/ParallelingBoard-_1_-_1_.jpg\",\"contentUrl\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/ParallelingBoard-_1_-_1_.jpg\",\"width\":807,\"height\":774,\"caption\":\"Designed for maximum safety and operating simplicity, the systems are supervisory control and data acquisition (SCADA)-capable\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/paralleling-switchgear-for-emergency-back-up-power-2\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Paralleling switchgear for emergency back-up power\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/\",\"name\":\"Engineer News Network\",\"description\":\"The ultimate online news and information resource for today's engineer\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/#\\\/schema\\\/person\\\/4477342aea8e299c6a21761e513ea8e1\",\"name\":\"admin\",\"url\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/author\\\/admin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Paralleling switchgear for emergency back-up power - Engineer News Network","description":"Russelectric Emergency Power System offers redundant PLC controls and manual back-up capability\ufeff","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.engineernewsnetwork.com\/blog\/paralleling-switchgear-for-emergency-back-up-power-2\/","og_locale":"en_GB","og_type":"article","og_title":"Paralleling switchgear for emergency back-up power - Engineer News Network","og_description":"Russelectric Emergency Power System offers redundant PLC controls and manual back-up capability\ufeff","og_url":"https:\/\/www.engineernewsnetwork.com\/blog\/paralleling-switchgear-for-emergency-back-up-power-2\/","og_site_name":"Engineer News Network","article_published_time":"2022-05-04T09:31:24+00:00","article_modified_time":"2022-05-04T09:31:25+00:00","og_image":[{"width":807,"height":774,"url":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2022\/05\/ParallelingBoard-_1_-_1_.jpg","type":"image\/jpeg"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Estimated reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/paralleling-switchgear-for-emergency-back-up-power-2\/#article","isPartOf":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/paralleling-switchgear-for-emergency-back-up-power-2\/"},"author":{"name":"admin","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1"},"headline":"Paralleling switchgear for emergency back-up power","datePublished":"2022-05-04T09:31:24+00:00","dateModified":"2022-05-04T09:31:25+00:00","mainEntityOfPage":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/paralleling-switchgear-for-emergency-back-up-power-2\/"},"wordCount":234,"image":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/paralleling-switchgear-for-emergency-back-up-power-2\/#primaryimage"},"thumbnailUrl":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2022\/05\/ParallelingBoard-_1_-_1_.jpg","keywords":["Emergency Power System","Russelectric"],"articleSection":["Power"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/paralleling-switchgear-for-emergency-back-up-power-2\/","url":"https:\/\/www.engineernewsnetwork.com\/blog\/paralleling-switchgear-for-emergency-back-up-power-2\/","name":"Paralleling switchgear for emergency back-up power - Engineer News Network","isPartOf":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/paralleling-switchgear-for-emergency-back-up-power-2\/#primaryimage"},"image":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/paralleling-switchgear-for-emergency-back-up-power-2\/#primaryimage"},"thumbnailUrl":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2022\/05\/ParallelingBoard-_1_-_1_.jpg","datePublished":"2022-05-04T09:31:24+00:00","dateModified":"2022-05-04T09:31:25+00:00","author":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1"},"description":"Russelectric Emergency Power System offers redundant PLC controls and manual back-up capability\ufeff","breadcrumb":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/paralleling-switchgear-for-emergency-back-up-power-2\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.engineernewsnetwork.com\/blog\/paralleling-switchgear-for-emergency-back-up-power-2\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/paralleling-switchgear-for-emergency-back-up-power-2\/#primaryimage","url":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2022\/05\/ParallelingBoard-_1_-_1_.jpg","contentUrl":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2022\/05\/ParallelingBoard-_1_-_1_.jpg","width":807,"height":774,"caption":"Designed for maximum safety and operating simplicity, the systems are supervisory control and data acquisition (SCADA)-capable"},{"@type":"BreadcrumbList","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/paralleling-switchgear-for-emergency-back-up-power-2\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.engineernewsnetwork.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Paralleling switchgear for emergency back-up power"}]},{"@type":"WebSite","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#website","url":"https:\/\/www.engineernewsnetwork.com\/blog\/","name":"Engineer News Network","description":"The ultimate online news and information resource for today's engineer","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.engineernewsnetwork.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Person","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1","name":"admin","url":"https:\/\/www.engineernewsnetwork.com\/blog\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts\/21633","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/comments?post=21633"}],"version-history":[{"count":1,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts\/21633\/revisions"}],"predecessor-version":[{"id":21635,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts\/21633\/revisions\/21635"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/media\/21634"}],"wp:attachment":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/media?parent=21633"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/categories?post=21633"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/tags?post=21633"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}