{"id":21958,"date":"2022-06-07T09:48:18","date_gmt":"2022-06-07T08:48:18","guid":{"rendered":"https:\/\/www.engineernewsnetwork.com\/blog\/?p=21958"},"modified":"2022-06-07T09:48:19","modified_gmt":"2022-06-07T08:48:19","slug":"top-three-safety-hazards-to-avoid-for-pv-solar-installations","status":"publish","type":"post","link":"https:\/\/www.engineernewsnetwork.com\/blog\/top-three-safety-hazards-to-avoid-for-pv-solar-installations\/","title":{"rendered":"Top three safety hazards to avoid for PV solar installations"},"content":{"rendered":"\n<p>Renewable energy is one of the fastest-growing markets in the world \u2013 in the UK, solar installations have doubled within the last year and are expected to double again by 2030. \u00a0<\/p>\n\n\n\n<p>Such rapid expansion is accelerating the search for ways to reduce risks associated with commissioning and installing photovoltaic (PV) systems.&nbsp;<\/p>\n\n\n\n<p>In PV applications current is \u2018wild\u2019 and not limited by electronics, therefore choosing the correct solar testing equipment is vital if workers \u2013 and the PV system itself \u2013 are to be protected against a range of potential electrical hazards.&nbsp;<\/p>\n\n\n\n<p>Here, <strong><a href=\"https:\/\/www.fluke.com\/en-gb\/product\/electrical-testing\/clamp-meters\/fluke-393-fc-cat-iii-1500-v-true-rms-clamp-meter\" target=\"_blank\" rel=\"noreferrer noopener\">Fluke<\/a><\/strong> highlights the top three electrical hazards to avoid when installing and maintaining PV solar installations to keep technicians safe.<\/p>\n\n\n\n<p><strong>1. Electrocution.<\/strong> The Fluke 393 FC helps to protect against the three main electrical hazards \u2013 shock or electrocution from energised conductors, arc faults that spark fires and arc flash that leads to explosions. Control measures and best practices that can mitigate these risks are different when working with PV to working with any other kind of energy generating resource. That\u2019s why it\u2019s important that multimeters, test leads and fuses are rated for the application being worked on.<\/p>\n\n\n\n<p>Shock or electrocution from energised conductors can happen when current takes an unintended path through a human body, with lethal results from as little as 50 milliamps (mA) hitting the heart. Electrical shocks are typically caused by a faulty insulation of cables and wiring, damaged insulation of safety covers or improper grounding. The main places such conditions exist in a PV system are the combiner box, the equipment grounding conductor, the PV source and output circuit conductors.&nbsp;<\/p>\n\n\n\n<p><strong>2. Arc faults and arc flash.<\/strong> Electrical arc faults that spark fires are high power discharges of electricity between two or more conductors, with the discharge causing heat that can lead to the deterioration or even to burning of wiring insulation. PV systems are particularly vulnerable to arc faults caused by disruption in conductor continuity or by unexpected current between two conductors, often the result of a ground fault.\u00a0<\/p>\n\n\n\n<p>Arc flash is a phenomenon of large-scale PV arrays that have medium-to-high voltage levels. Only since large-scale solar energy systems gave been created has arc flash become a DC issue, which is why arc flash hazard risk analysis must now be carried out on DC systems over 120&nbsp;V. The issue is particularly prevalent when fault-checking in energised combiner boxes, where PV source circuits are used in parallel to increase current, or when carrying out checks on medium-to-high voltage switchgear and transformers. An arc flash happens when there\u2019s a significant level of energy available to an arc fault in DC and AC conductors. The flash emits hot gases and radiant energy that can be around 19,500\u00b0&nbsp;C (or four times the temperature of the surface of the sun). The most at risk set-ups are residential inverters with input voltage up to 500&nbsp;V and large-scale inverters with up to 1500&nbsp;V. It\u2019s essential to use a meter that\u2019s rated for the relevant measurement category or CAT rating as well as the application\u2019s voltage level. This is so the unit can cope with average voltage levels and high voltage spikes and transients that are capable of producing shocks or causing an arc flash.<\/p>\n\n\n\n<p><strong>3. Switching to 1500V.<\/strong> Most major manufacturers of inverters and solar modules are shifting from 1000\u00a0V systems to 1500\u00a0V for greater efficiency. For solar installations, overvoltage category CAT\u00a0III 1500\u00a0V systems are being more widely used and CAT\u00a0III and CAT\u00a0IV equipment is essential for PV systems at high altitudes. Only the Fluke 393 FC True-RMS Solar Clamp Meter matches the insulation demands of such CAT III environments.<\/p>\n\n\n\n<p>The meter is designed specifically for use by PV installation technicians and maintenance specialists who work in high voltage DC environments. The clamp can measure up to 1500V DC, 1000V AC, DC power and current up to 999.9A DC or AC through the thin jaw which is ideal for the kind of cramped spaces found in combiner boxes or inverters. Other key features of the clamp, which has a three-year warranty and is IP54 rated (making it well suited to work outdoors), include an audio polarity indicator that helps to prevent accidental mis wires by ensuring PV panels are installed correctly.&nbsp;<\/p>\n\n\n\n<p>Polarity functions and audible and visual polarity checks are crucial when commissioning a new site, whether at the combiner box level or inverter level. With a DC polarity check, it&#8217;s easy to spot if polarity of strings has been reversed accidentally, avoiding the risk of fires at the combiner box as well as damage to the equipment and danger to personnel.&nbsp;<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large\"><a href=\"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2022\/06\/F-393fc_08a_c.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"770\" height=\"1024\" src=\"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2022\/06\/F-393fc_08a_c-770x1024.jpg\" alt=\"\" class=\"wp-image-21960\" srcset=\"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2022\/06\/F-393fc_08a_c-770x1024.jpg 770w, https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2022\/06\/F-393fc_08a_c-226x300.jpg 226w, https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2022\/06\/F-393fc_08a_c-768x1021.jpg 768w, https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2022\/06\/F-393fc_08a_c.jpg 1128w\" sizes=\"auto, (max-width: 770px) 100vw, 770px\" \/><\/a><figcaption><br>The demand for highly accurate hand-held devices capable of carrying out safe and reliable measurements in these applications has now been met with the introduction of the world\u2019s first CAT III 1500 V true-RMS solar clamp meter \u2013 the Fluke 393 F<\/figcaption><\/figure><\/div>\n\n\n\n<p><strong>Safe, reliable and rugged<\/strong><\/p>\n\n\n\n<p>All test results are logged and reported via the Fluke Connect software that comes with the Fluke 393 FC true-RMS Solar Clamp Meter. Using just a phone, engineers can make and save measurements quickly, with the phone recording for 10 minutes and reporting readings to colleagues. Capable of measuring and recording up to two weeks, this safe, reliable and rugged meter also comes with an 18-inch iFlex flexible current probe for extended AC current measurements up to 2500 amps. Test leads are also rated to CAT III 1500&nbsp;V DC.<\/p>\n\n\n\n<p>Hans-Dieter Schuessele, Application and Technology Expert EMEA, Fluke said: \u201cSafety is essential when commissioning and installing PV systems. The future of power needs tools that are able to keep you safe in harsh environments \u2013 risk is not an option and you literally have to trust your meter with your life. That\u2019s why the world\u2019s first CAT III 1500&nbsp;V true-RMS clamp meter has been designed to deliver enhanced protection for users in challenging CAT III environments. It\u2019s very important that there\u2019s a solid meter with multiple functions capable of operating at that rating \u2013 the solar industry desperately needs a solution like the Fluke 393 FC.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Renewable energy is one of the fastest-growing markets in the world \u2013 in the UK, solar installations have doubled within the last year and are expected to double again by 2030. \u00a0 Such rapid expansion is accelerating the search for ways to reduce risks associated with commissioning and installing photovoltaic (PV) systems.&nbsp; In PV applications &hellip;<\/p>\n","protected":false},"author":1,"featured_media":21959,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[107],"tags":[462,10343,10344,10345],"class_list":["post-21958","post","type-post","status-publish","format-standard","has-post-thumbnail","","category-power","tag-fluke","tag-fluke-393-fc","tag-pv-solar-installations","tag-safety-hazards"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Top three safety hazards to avoid for PV solar installations - Engineer News Network<\/title>\n<meta name=\"description\" content=\"Safety levels during solar panel commissioning and installation have been strengthened substantially by the world\u2019s first CAT III 1500 V true-RMS solar clamp meter\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.engineernewsnetwork.com\/blog\/top-three-safety-hazards-to-avoid-for-pv-solar-installations\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Top three safety hazards to avoid for PV solar installations - Engineer News Network\" \/>\n<meta property=\"og:description\" content=\"Safety levels during solar panel commissioning and installation have been strengthened substantially by the world\u2019s first CAT III 1500 V true-RMS solar clamp meter\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.engineernewsnetwork.com\/blog\/top-three-safety-hazards-to-avoid-for-pv-solar-installations\/\" \/>\n<meta property=\"og:site_name\" content=\"Engineer News Network\" \/>\n<meta property=\"article:published_time\" content=\"2022-06-07T08:48:18+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-06-07T08:48:19+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2022\/06\/F-393fc_41a_c.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1500\" \/>\n\t<meta property=\"og:image:height\" content=\"844\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/top-three-safety-hazards-to-avoid-for-pv-solar-installations\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/top-three-safety-hazards-to-avoid-for-pv-solar-installations\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1\"},\"headline\":\"Top three safety hazards to avoid for PV solar installations\",\"datePublished\":\"2022-06-07T08:48:18+00:00\",\"dateModified\":\"2022-06-07T08:48:19+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/top-three-safety-hazards-to-avoid-for-pv-solar-installations\/\"},\"wordCount\":1018,\"image\":{\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/top-three-safety-hazards-to-avoid-for-pv-solar-installations\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2022\/06\/F-393fc_41a_c.jpg\",\"keywords\":[\"Fluke\",\"Fluke 393 FC\",\"PV solar installations\",\"safety hazards\"],\"articleSection\":[\"Power\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/top-three-safety-hazards-to-avoid-for-pv-solar-installations\/\",\"url\":\"https:\/\/www.engineernewsnetwork.com\/blog\/top-three-safety-hazards-to-avoid-for-pv-solar-installations\/\",\"name\":\"Top three safety hazards to avoid for PV solar installations - Engineer News Network\",\"isPartOf\":{\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/top-three-safety-hazards-to-avoid-for-pv-solar-installations\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/top-three-safety-hazards-to-avoid-for-pv-solar-installations\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2022\/06\/F-393fc_41a_c.jpg\",\"datePublished\":\"2022-06-07T08:48:18+00:00\",\"dateModified\":\"2022-06-07T08:48:19+00:00\",\"author\":{\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1\"},\"description\":\"Safety levels during solar panel commissioning and installation have been strengthened substantially by the world\u2019s first CAT III 1500 V true-RMS solar clamp meter\",\"breadcrumb\":{\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/top-three-safety-hazards-to-avoid-for-pv-solar-installations\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.engineernewsnetwork.com\/blog\/top-three-safety-hazards-to-avoid-for-pv-solar-installations\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/top-three-safety-hazards-to-avoid-for-pv-solar-installations\/#primaryimage\",\"url\":\"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2022\/06\/F-393fc_41a_c.jpg\",\"contentUrl\":\"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2022\/06\/F-393fc_41a_c.jpg\",\"width\":1500,\"height\":844,\"caption\":\"The search for ways to reduce risks associated with commissioning and installing photovoltaic (PV) systems is accelerating\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/top-three-safety-hazards-to-avoid-for-pv-solar-installations\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.engineernewsnetwork.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Top three safety hazards to avoid for PV solar installations\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/#website\",\"url\":\"https:\/\/www.engineernewsnetwork.com\/blog\/\",\"name\":\"Engineer News Network\",\"description\":\"The ultimate online news and information resource for today's engineer\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.engineernewsnetwork.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1\",\"name\":\"admin\",\"url\":\"https:\/\/www.engineernewsnetwork.com\/blog\/author\/admin\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Top three safety hazards to avoid for PV solar installations - Engineer News Network","description":"Safety levels during solar panel commissioning and installation have been strengthened substantially by the world\u2019s first CAT III 1500 V true-RMS solar clamp meter","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.engineernewsnetwork.com\/blog\/top-three-safety-hazards-to-avoid-for-pv-solar-installations\/","og_locale":"en_GB","og_type":"article","og_title":"Top three safety hazards to avoid for PV solar installations - Engineer News Network","og_description":"Safety levels during solar panel commissioning and installation have been strengthened substantially by the world\u2019s first CAT III 1500 V true-RMS solar clamp meter","og_url":"https:\/\/www.engineernewsnetwork.com\/blog\/top-three-safety-hazards-to-avoid-for-pv-solar-installations\/","og_site_name":"Engineer News Network","article_published_time":"2022-06-07T08:48:18+00:00","article_modified_time":"2022-06-07T08:48:19+00:00","og_image":[{"width":1500,"height":844,"url":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2022\/06\/F-393fc_41a_c.jpg","type":"image\/jpeg"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Estimated reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/top-three-safety-hazards-to-avoid-for-pv-solar-installations\/#article","isPartOf":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/top-three-safety-hazards-to-avoid-for-pv-solar-installations\/"},"author":{"name":"admin","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1"},"headline":"Top three safety hazards to avoid for PV solar installations","datePublished":"2022-06-07T08:48:18+00:00","dateModified":"2022-06-07T08:48:19+00:00","mainEntityOfPage":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/top-three-safety-hazards-to-avoid-for-pv-solar-installations\/"},"wordCount":1018,"image":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/top-three-safety-hazards-to-avoid-for-pv-solar-installations\/#primaryimage"},"thumbnailUrl":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2022\/06\/F-393fc_41a_c.jpg","keywords":["Fluke","Fluke 393 FC","PV solar installations","safety hazards"],"articleSection":["Power"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/top-three-safety-hazards-to-avoid-for-pv-solar-installations\/","url":"https:\/\/www.engineernewsnetwork.com\/blog\/top-three-safety-hazards-to-avoid-for-pv-solar-installations\/","name":"Top three safety hazards to avoid for PV solar installations - Engineer News Network","isPartOf":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/top-three-safety-hazards-to-avoid-for-pv-solar-installations\/#primaryimage"},"image":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/top-three-safety-hazards-to-avoid-for-pv-solar-installations\/#primaryimage"},"thumbnailUrl":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2022\/06\/F-393fc_41a_c.jpg","datePublished":"2022-06-07T08:48:18+00:00","dateModified":"2022-06-07T08:48:19+00:00","author":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1"},"description":"Safety levels during solar panel commissioning and installation have been strengthened substantially by the world\u2019s first CAT III 1500 V true-RMS solar clamp meter","breadcrumb":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/top-three-safety-hazards-to-avoid-for-pv-solar-installations\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.engineernewsnetwork.com\/blog\/top-three-safety-hazards-to-avoid-for-pv-solar-installations\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/top-three-safety-hazards-to-avoid-for-pv-solar-installations\/#primaryimage","url":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2022\/06\/F-393fc_41a_c.jpg","contentUrl":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2022\/06\/F-393fc_41a_c.jpg","width":1500,"height":844,"caption":"The search for ways to reduce risks associated with commissioning and installing photovoltaic (PV) systems is accelerating"},{"@type":"BreadcrumbList","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/top-three-safety-hazards-to-avoid-for-pv-solar-installations\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.engineernewsnetwork.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Top three safety hazards to avoid for PV solar installations"}]},{"@type":"WebSite","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#website","url":"https:\/\/www.engineernewsnetwork.com\/blog\/","name":"Engineer News Network","description":"The ultimate online news and information resource for today's engineer","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.engineernewsnetwork.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Person","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1","name":"admin","url":"https:\/\/www.engineernewsnetwork.com\/blog\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts\/21958","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/comments?post=21958"}],"version-history":[{"count":1,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts\/21958\/revisions"}],"predecessor-version":[{"id":21961,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts\/21958\/revisions\/21961"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/media\/21959"}],"wp:attachment":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/media?parent=21958"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/categories?post=21958"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/tags?post=21958"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}