{"id":23100,"date":"2022-09-22T09:17:37","date_gmt":"2022-09-22T08:17:37","guid":{"rendered":"https:\/\/www.engineernewsnetwork.com\/blog\/?p=23100"},"modified":"2022-09-22T09:17:38","modified_gmt":"2022-09-22T08:17:38","slug":"indonesia-to-speed-up-geothermal-development-to-solve-energy-issues","status":"publish","type":"post","link":"https:\/\/www.engineernewsnetwork.com\/blog\/indonesia-to-speed-up-geothermal-development-to-solve-energy-issues\/","title":{"rendered":"Indonesia to speed up geothermal development to solve energy issues"},"content":{"rendered":"\n<p>With an estimated 24GW in geothermal reserves that account for 40% of the world&#8217;s geothermal resources, Indonesia is set to accelerate the geothermal power development to solve its energy issues, says GlobalData, the data and analytics company.<\/p>\n\n\n\n<p>GlobalData&#8217;s latest report, <strong><em><a href=\"https:\/\/www.globaldata.com\/store\/report\/indonesia-power-market-analysis\/\" target=\"_blank\" rel=\"noreferrer noopener\">Indonesia Power Market Size, Trends, Regulations, Competitive Landscape and Forecast, 2022-2035<\/a><\/em><\/strong>, reveals that Indonesia has identified over 300 sites across islands including Sumatra, Java, Nusa Tenggara, Sulawesi, and Maluku for geothermal power development. The country has created a fund of around IDR 3.7 trillion (around $275 million) for the development of geothermal technology. Managed by PT Sarana Multi Infrastruktur (PT SMI), the fund will be primarily used for lending activities, equity participation and or providing data and geothermal information.<\/p>\n\n\n\n<p>Attaurrahman Ojindaram Saibasan, Power Analyst at GlobalData, comments: &#8220;Indonesia updated its laws on geothermal activities in 2014. The revised regulation no longer considers geothermal under &#8216;mining activities&#8217; as mining activities are currently prohibited in high conservation value forest areas. The regulation also introduced a mandatory production bonus payable to the local government in which the geothermal field is located, and auctions were introduced for geothermal working areas (WKP) to encourage industry participation.&#8221;<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><a href=\"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2022\/09\/vcsPRAsset_3434416_157706_8993f955-ca89-42ad-819d-2aac2bbd2a91_0.png\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"549\" src=\"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2022\/09\/vcsPRAsset_3434416_157706_8993f955-ca89-42ad-819d-2aac2bbd2a91_0-1024x549.png\" alt=\"Indonesia to speed up geothermal development to solve energy issues\" class=\"wp-image-23101\" srcset=\"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2022\/09\/vcsPRAsset_3434416_157706_8993f955-ca89-42ad-819d-2aac2bbd2a91_0-1024x549.png 1024w, https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2022\/09\/vcsPRAsset_3434416_157706_8993f955-ca89-42ad-819d-2aac2bbd2a91_0-300x161.png 300w, https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2022\/09\/vcsPRAsset_3434416_157706_8993f955-ca89-42ad-819d-2aac2bbd2a91_0-768x412.png 768w, https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2022\/09\/vcsPRAsset_3434416_157706_8993f955-ca89-42ad-819d-2aac2bbd2a91_0-310x165.png 310w, https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2022\/09\/vcsPRAsset_3434416_157706_8993f955-ca89-42ad-819d-2aac2bbd2a91_0.png 1172w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n<\/div>\n\n\n<p>Indonesia has made geothermal power development as one of its key priorities and has set a target of achieving 9.3GW geothermal cumulative capacity by 2035, in order to solve several energy issues and achieve its climate goals. Given the current trend, the country is expected to achieve 8.1GW by 2035.<\/p>\n\n\n\n<p>Saibasan adds: &#8220;However, the target may still be achievable if the government succeeds in conducting WKP auctions without delays, provides incentives to overcome the upfront costs in the exploration stage, and rallies more foreign private investments.&#8221;<\/p>\n\n\n\n<p>Geothermal power is also expected to help Indonesia overcome risks associated with its dependence on fossil fuel imports and reduce the country&#8217;s economic burden resulting from fossil fuel subsidies. In 2021, IDR 83.7 trillion was spent on fossil fuel subsidies and it is estimated that it would burden the country&#8217;s economy by IDR 77.5 trillion in 2022.<\/p>\n\n\n\n<p>Saibasan concludes: &#8220;Geothermal holds the key to achieving the country&#8217;s target of achieving 23% of its energy requirements from renewables and cut its carbon emissions to net zero by 2060. The government also hopes to achieve 100% electrification rate in the country and geothermal is considered as a reliable source to reach it.&#8221;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>With an estimated 24GW in geothermal reserves that account for 40% of the world&#8217;s geothermal resources, Indonesia is set to accelerate the geothermal power development to solve its energy issues, says GlobalData, the data and analytics company. GlobalData&#8217;s latest report, Indonesia Power Market Size, Trends, Regulations, Competitive Landscape and Forecast, 2022-2035, reveals that Indonesia has &hellip;<\/p>\n","protected":false},"author":1,"featured_media":23101,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[199,107],"tags":[10810,246,10809],"class_list":["post-23100","post","type-post","status-publish","format-standard","has-post-thumbnail","","category-news-views-and-opinion","category-power","tag-geothermal","tag-globaldata","tag-indonesia"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Indonesia to speed up geothermal development to solve energy issues - Engineer News Network<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.engineernewsnetwork.com\/blog\/indonesia-to-speed-up-geothermal-development-to-solve-energy-issues\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Indonesia to speed up geothermal development to solve energy issues - Engineer News Network\" \/>\n<meta property=\"og:description\" content=\"With an estimated 24GW in geothermal reserves that account for 40% of the world&#8217;s geothermal resources, Indonesia is set to accelerate the geothermal power development to solve its energy issues, says GlobalData, the data and analytics company. GlobalData&#8217;s latest report, Indonesia Power Market Size, Trends, Regulations, Competitive Landscape and Forecast, 2022-2035, reveals that Indonesia has &hellip;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.engineernewsnetwork.com\/blog\/indonesia-to-speed-up-geothermal-development-to-solve-energy-issues\/\" \/>\n<meta property=\"og:site_name\" content=\"Engineer News Network\" \/>\n<meta property=\"article:published_time\" content=\"2022-09-22T08:17:37+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-09-22T08:17:38+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2022\/09\/vcsPRAsset_3434416_157706_8993f955-ca89-42ad-819d-2aac2bbd2a91_0.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1172\" \/>\n\t<meta property=\"og:image:height\" content=\"628\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/indonesia-to-speed-up-geothermal-development-to-solve-energy-issues\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/indonesia-to-speed-up-geothermal-development-to-solve-energy-issues\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1\"},\"headline\":\"Indonesia to speed up geothermal development to solve energy issues\",\"datePublished\":\"2022-09-22T08:17:37+00:00\",\"dateModified\":\"2022-09-22T08:17:38+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/indonesia-to-speed-up-geothermal-development-to-solve-energy-issues\/\"},\"wordCount\":383,\"image\":{\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/indonesia-to-speed-up-geothermal-development-to-solve-energy-issues\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2022\/09\/vcsPRAsset_3434416_157706_8993f955-ca89-42ad-819d-2aac2bbd2a91_0.png\",\"keywords\":[\"geothermal\",\"GlobalData\",\"Indonesia\"],\"articleSection\":[\"News, Views and Opinion\",\"Power\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/indonesia-to-speed-up-geothermal-development-to-solve-energy-issues\/\",\"url\":\"https:\/\/www.engineernewsnetwork.com\/blog\/indonesia-to-speed-up-geothermal-development-to-solve-energy-issues\/\",\"name\":\"Indonesia to speed up geothermal development to solve energy issues - Engineer News Network\",\"isPartOf\":{\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/indonesia-to-speed-up-geothermal-development-to-solve-energy-issues\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/indonesia-to-speed-up-geothermal-development-to-solve-energy-issues\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2022\/09\/vcsPRAsset_3434416_157706_8993f955-ca89-42ad-819d-2aac2bbd2a91_0.png\",\"datePublished\":\"2022-09-22T08:17:37+00:00\",\"dateModified\":\"2022-09-22T08:17:38+00:00\",\"author\":{\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1\"},\"breadcrumb\":{\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/indonesia-to-speed-up-geothermal-development-to-solve-energy-issues\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.engineernewsnetwork.com\/blog\/indonesia-to-speed-up-geothermal-development-to-solve-energy-issues\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/indonesia-to-speed-up-geothermal-development-to-solve-energy-issues\/#primaryimage\",\"url\":\"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2022\/09\/vcsPRAsset_3434416_157706_8993f955-ca89-42ad-819d-2aac2bbd2a91_0.png\",\"contentUrl\":\"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2022\/09\/vcsPRAsset_3434416_157706_8993f955-ca89-42ad-819d-2aac2bbd2a91_0.png\",\"width\":1172,\"height\":628,\"caption\":\"Indonesia to speed up geothermal development to solve energy issues\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/indonesia-to-speed-up-geothermal-development-to-solve-energy-issues\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.engineernewsnetwork.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Indonesia to speed up geothermal development to solve energy issues\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/#website\",\"url\":\"https:\/\/www.engineernewsnetwork.com\/blog\/\",\"name\":\"Engineer News Network\",\"description\":\"The ultimate online news and information resource for today's engineer\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.engineernewsnetwork.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1\",\"name\":\"admin\",\"url\":\"https:\/\/www.engineernewsnetwork.com\/blog\/author\/admin\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Indonesia to speed up geothermal development to solve energy issues - Engineer News Network","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.engineernewsnetwork.com\/blog\/indonesia-to-speed-up-geothermal-development-to-solve-energy-issues\/","og_locale":"en_GB","og_type":"article","og_title":"Indonesia to speed up geothermal development to solve energy issues - Engineer News Network","og_description":"With an estimated 24GW in geothermal reserves that account for 40% of the world&#8217;s geothermal resources, Indonesia is set to accelerate the geothermal power development to solve its energy issues, says GlobalData, the data and analytics company. GlobalData&#8217;s latest report, Indonesia Power Market Size, Trends, Regulations, Competitive Landscape and Forecast, 2022-2035, reveals that Indonesia has &hellip;","og_url":"https:\/\/www.engineernewsnetwork.com\/blog\/indonesia-to-speed-up-geothermal-development-to-solve-energy-issues\/","og_site_name":"Engineer News Network","article_published_time":"2022-09-22T08:17:37+00:00","article_modified_time":"2022-09-22T08:17:38+00:00","og_image":[{"width":1172,"height":628,"url":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2022\/09\/vcsPRAsset_3434416_157706_8993f955-ca89-42ad-819d-2aac2bbd2a91_0.png","type":"image\/png"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Estimated reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/indonesia-to-speed-up-geothermal-development-to-solve-energy-issues\/#article","isPartOf":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/indonesia-to-speed-up-geothermal-development-to-solve-energy-issues\/"},"author":{"name":"admin","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1"},"headline":"Indonesia to speed up geothermal development to solve energy issues","datePublished":"2022-09-22T08:17:37+00:00","dateModified":"2022-09-22T08:17:38+00:00","mainEntityOfPage":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/indonesia-to-speed-up-geothermal-development-to-solve-energy-issues\/"},"wordCount":383,"image":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/indonesia-to-speed-up-geothermal-development-to-solve-energy-issues\/#primaryimage"},"thumbnailUrl":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2022\/09\/vcsPRAsset_3434416_157706_8993f955-ca89-42ad-819d-2aac2bbd2a91_0.png","keywords":["geothermal","GlobalData","Indonesia"],"articleSection":["News, Views and Opinion","Power"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/indonesia-to-speed-up-geothermal-development-to-solve-energy-issues\/","url":"https:\/\/www.engineernewsnetwork.com\/blog\/indonesia-to-speed-up-geothermal-development-to-solve-energy-issues\/","name":"Indonesia to speed up geothermal development to solve energy issues - Engineer News Network","isPartOf":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/indonesia-to-speed-up-geothermal-development-to-solve-energy-issues\/#primaryimage"},"image":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/indonesia-to-speed-up-geothermal-development-to-solve-energy-issues\/#primaryimage"},"thumbnailUrl":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2022\/09\/vcsPRAsset_3434416_157706_8993f955-ca89-42ad-819d-2aac2bbd2a91_0.png","datePublished":"2022-09-22T08:17:37+00:00","dateModified":"2022-09-22T08:17:38+00:00","author":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1"},"breadcrumb":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/indonesia-to-speed-up-geothermal-development-to-solve-energy-issues\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.engineernewsnetwork.com\/blog\/indonesia-to-speed-up-geothermal-development-to-solve-energy-issues\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/indonesia-to-speed-up-geothermal-development-to-solve-energy-issues\/#primaryimage","url":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2022\/09\/vcsPRAsset_3434416_157706_8993f955-ca89-42ad-819d-2aac2bbd2a91_0.png","contentUrl":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2022\/09\/vcsPRAsset_3434416_157706_8993f955-ca89-42ad-819d-2aac2bbd2a91_0.png","width":1172,"height":628,"caption":"Indonesia to speed up geothermal development to solve energy issues"},{"@type":"BreadcrumbList","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/indonesia-to-speed-up-geothermal-development-to-solve-energy-issues\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.engineernewsnetwork.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Indonesia to speed up geothermal development to solve energy issues"}]},{"@type":"WebSite","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#website","url":"https:\/\/www.engineernewsnetwork.com\/blog\/","name":"Engineer News Network","description":"The ultimate online news and information resource for today's engineer","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.engineernewsnetwork.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Person","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1","name":"admin","url":"https:\/\/www.engineernewsnetwork.com\/blog\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts\/23100","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/comments?post=23100"}],"version-history":[{"count":1,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts\/23100\/revisions"}],"predecessor-version":[{"id":23102,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts\/23100\/revisions\/23102"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/media\/23101"}],"wp:attachment":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/media?parent=23100"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/categories?post=23100"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/tags?post=23100"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}