{"id":25714,"date":"2023-07-26T09:15:00","date_gmt":"2023-07-26T08:15:00","guid":{"rendered":"https:\/\/www.engineernewsnetwork.com\/blog\/?p=25714"},"modified":"2023-07-26T10:22:15","modified_gmt":"2023-07-26T09:22:15","slug":"e-mobility-how-to-implement-infrastructure-more-quickly","status":"publish","type":"post","link":"https:\/\/www.engineernewsnetwork.com\/blog\/e-mobility-how-to-implement-infrastructure-more-quickly\/","title":{"rendered":"E-mobility: how to implement infrastructure more quickly"},"content":{"rendered":"\n<p><strong>Research by the <a href=\"https:\/\/www.rac.co.uk\/drive\/news\/motoring-news\/government-not-on-track-to-hit-motorway-services-ev-charger-target-by-end-o\/\" target=\"_blank\" rel=\"noreferrer noopener\">R<\/a><a href=\"https:\/\/www.rac.co.uk\/drive\/news\/motoring-news\/government-not-on-track-to-hit-motorway-services-ev-charger-target-by-end-o\/\">AC<\/a> shows that the UK government is unlikely to meet its target of having six or more rapid or ultra-rapid electric vehicle chargers at every motorway service area in England by the end of 2023. So how does the land lie for the much larger, heavy-duty commercial vehicles that require infrastructure for high-power charging stations? Roger Brereton reports<\/strong><\/p>\n\n\n\n<p><a href=\"https:\/\/www.acea.auto\/figure\/interactive-map-truck-charging-points-needed-in-europe-by-2025-and-2030-per-country\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>ACEA<\/strong><\/a>, the European Automobile Manufacturers\u2019 Association, estimates that trucks in the EU27 + UK region will need 10,000 \u2013 15,000 higher power public and destination charging points by 2025, and 40,000 \u2013 50,000 by 2030. By this latter date, ACEA also estimates that there should be 40,000 lower-power public overnight chargers at truck parking areas.&nbsp;<\/p>\n\n\n\n<p>The need for these charging stations is reinforced by the fact that approximately 40,000 battery electric medium and heavy\u2010duty vehicles will be in operation in Europe in 2025. This figure is expected to rise to 270,000 by 2030.&nbsp;<\/p>\n\n\n\n<p>Unfortunately, the infrastructure that is required to charge these larger electric vehicles is almost nonexistent today. This is despite <a href=\"https:\/\/thedriven.io\/2023\/03\/29\/eu-votes-to-kill-range-anxiety-with-rapid-boost-in-ev-chargers-for-cars-and-trucks\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>a<\/strong><\/a><a href=\"https:\/\/thedriven.io\/2023\/03\/29\/eu-votes-to-kill-range-anxiety-with-rapid-boost-in-ev-chargers-for-cars-and-trucks\/\"><strong> new law agreed by the European Union<\/strong><\/a> promising that 3,600 kW of truck charging capacity every 60 km will be installed along the EU\u2019s primary motorways by 2030.&nbsp;<\/p>\n\n\n\n<p>Unlike cars, commercial vehicles such as buses and trucks cannot use the existing infrastructure. Instead, dedicated high-power charging stations, commonly known as direct current (DC) fast chargers or superchargers, are needed to deliver high-voltage DC directly to the vehicle&#8217;s battery.&nbsp;<\/p>\n\n\n\n<p><strong>Speeding up infrastructure implementation &nbsp;<\/strong><\/p>\n\n\n\n<p>As ACEA argues, the shortage of commercial vehicle infrastructure must be tackled urgently, with policymakers needing to take action to ensure a rapid infrastructure roll\u2010out.&nbsp;<\/p>\n\n\n\n<p>The plan is to ensure adequate public charging by 2030. The Alternative Fuel Infrastructure Regulation (AFIR), a part of the EU\u2019s \u201cFit for 55\u201d regulatory action to make EU policies fit for reducing net greenhouse gas emissions by 55 per cent by 2030, states that there will be four charging stations in each designated safe and secure truck parking area.&nbsp;<\/p>\n\n\n\n<p>Although it could be argued that the regulation has not gone far or fast enough, it must be acknowledged that it does provide manufacturers with a useful basis for their infrastructure roadmaps.&nbsp;<\/p>\n\n\n\n<p><strong>Bridging the gap&nbsp;<\/strong><\/p>\n\n\n\n<p>Due to the current rate of installation, heavy-duty original equipment manufacturers (OEMs) cannot wait for the charging challenge to solve itself. As result, companies should undertake a proactive study of their customers\u2019 charging requirements, evaluate potential business models for strategic fit and then create an implementation roadmap for their chosen model.&nbsp;<\/p>\n\n\n\n<p>Of course, customers will not obtain true peace of mind until charging anxieties are resolved. Fortunately, this risk can be somewhat accommodated for, by using route planning and battery monitoring services in the context of adequate charging infrastructure.<\/p>\n\n\n\n<p>These monitoring services can provide real-time information about the availability and speed of charging stations along the planned route. This data can also be integrated into the route planning service, allowing drivers and fleet managers to make informed decisions about where to charge, helping to minimise wait times and optimise charging schedules.<\/p>\n\n\n\n<p>With that said, the infrastructure that is required to charge these larger, heavy-duty electric vehicles is almost nonexistent, but there are policies in place to counteract this issue.&nbsp;<\/p>\n\n\n\n<p>For charging stations in each designated safe and secure truck parking area to be installed by 2030, a rapid rollout needs to happen fast. Until now, it seems that the infrastructure for these larger vehicles has been somewhat ignored in the transition to e-mobility. &nbsp;<\/p>\n\n\n\n<p>Roger Brereton is Head of Sales at steering system specialist at <strong><a href=\"https:\/\/www.pailton.com\/?utm_source=sj&amp;utm_medium=referral&amp;utm_campaign=pae513_stonejunction&amp;utm_content=pae513\" target=\"_blank\" rel=\"noreferrer noopener\">Pailton Engineering<\/a><\/strong>. <\/p>\n","protected":false},"excerpt":{"rendered":"<p>Research by the RAC shows that the UK government is unlikely to meet its target of having six or more rapid or ultra-rapid electric vehicle chargers at every motorway service area in England by the end of 2023. So how does the land lie for the much larger, heavy-duty commercial vehicles that require infrastructure for &hellip;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[199],"tags":[419,1957,11860,761],"class_list":["post-25714","post","type-post","status-publish","format-standard","","category-news-views-and-opinion","tag-commercial-vehicles","tag-e-mobility","tag-electrification-infrastructure","tag-pailton-engineering"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>E-mobility: how to implement infrastructure more quickly - Engineer News Network<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.engineernewsnetwork.com\/blog\/e-mobility-how-to-implement-infrastructure-more-quickly\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"E-mobility: how to implement infrastructure more quickly - Engineer News Network\" \/>\n<meta property=\"og:description\" content=\"Research by the RAC shows that the UK government is unlikely to meet its target of having six or more rapid or ultra-rapid electric vehicle chargers at every motorway service area in England by the end of 2023. So how does the land lie for the much larger, heavy-duty commercial vehicles that require infrastructure for &hellip;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.engineernewsnetwork.com\/blog\/e-mobility-how-to-implement-infrastructure-more-quickly\/\" \/>\n<meta property=\"og:site_name\" content=\"Engineer News Network\" \/>\n<meta property=\"article:published_time\" content=\"2023-07-26T08:15:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-07-26T09:22:15+00:00\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/e-mobility-how-to-implement-infrastructure-more-quickly\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/e-mobility-how-to-implement-infrastructure-more-quickly\\\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/#\\\/schema\\\/person\\\/4477342aea8e299c6a21761e513ea8e1\"},\"headline\":\"E-mobility: how to implement infrastructure more quickly\",\"datePublished\":\"2023-07-26T08:15:00+00:00\",\"dateModified\":\"2023-07-26T09:22:15+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/e-mobility-how-to-implement-infrastructure-more-quickly\\\/\"},\"wordCount\":593,\"keywords\":[\"commercial vehicles\",\"E-Mobility\",\"electrification infrastructure\",\"Pailton Engineering\"],\"articleSection\":[\"News, Views and Opinion\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/e-mobility-how-to-implement-infrastructure-more-quickly\\\/\",\"url\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/e-mobility-how-to-implement-infrastructure-more-quickly\\\/\",\"name\":\"E-mobility: how to implement infrastructure more quickly - Engineer News Network\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/#website\"},\"datePublished\":\"2023-07-26T08:15:00+00:00\",\"dateModified\":\"2023-07-26T09:22:15+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/#\\\/schema\\\/person\\\/4477342aea8e299c6a21761e513ea8e1\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/e-mobility-how-to-implement-infrastructure-more-quickly\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/e-mobility-how-to-implement-infrastructure-more-quickly\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/e-mobility-how-to-implement-infrastructure-more-quickly\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"E-mobility: how to implement infrastructure more quickly\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/\",\"name\":\"Engineer News Network\",\"description\":\"The ultimate online news and information resource for today's engineer\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/#\\\/schema\\\/person\\\/4477342aea8e299c6a21761e513ea8e1\",\"name\":\"admin\",\"url\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/author\\\/admin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"E-mobility: how to implement infrastructure more quickly - Engineer News Network","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.engineernewsnetwork.com\/blog\/e-mobility-how-to-implement-infrastructure-more-quickly\/","og_locale":"en_GB","og_type":"article","og_title":"E-mobility: how to implement infrastructure more quickly - Engineer News Network","og_description":"Research by the RAC shows that the UK government is unlikely to meet its target of having six or more rapid or ultra-rapid electric vehicle chargers at every motorway service area in England by the end of 2023. So how does the land lie for the much larger, heavy-duty commercial vehicles that require infrastructure for &hellip;","og_url":"https:\/\/www.engineernewsnetwork.com\/blog\/e-mobility-how-to-implement-infrastructure-more-quickly\/","og_site_name":"Engineer News Network","article_published_time":"2023-07-26T08:15:00+00:00","article_modified_time":"2023-07-26T09:22:15+00:00","author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Estimated reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/e-mobility-how-to-implement-infrastructure-more-quickly\/#article","isPartOf":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/e-mobility-how-to-implement-infrastructure-more-quickly\/"},"author":{"name":"admin","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1"},"headline":"E-mobility: how to implement infrastructure more quickly","datePublished":"2023-07-26T08:15:00+00:00","dateModified":"2023-07-26T09:22:15+00:00","mainEntityOfPage":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/e-mobility-how-to-implement-infrastructure-more-quickly\/"},"wordCount":593,"keywords":["commercial vehicles","E-Mobility","electrification infrastructure","Pailton Engineering"],"articleSection":["News, Views and Opinion"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/e-mobility-how-to-implement-infrastructure-more-quickly\/","url":"https:\/\/www.engineernewsnetwork.com\/blog\/e-mobility-how-to-implement-infrastructure-more-quickly\/","name":"E-mobility: how to implement infrastructure more quickly - Engineer News Network","isPartOf":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#website"},"datePublished":"2023-07-26T08:15:00+00:00","dateModified":"2023-07-26T09:22:15+00:00","author":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1"},"breadcrumb":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/e-mobility-how-to-implement-infrastructure-more-quickly\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.engineernewsnetwork.com\/blog\/e-mobility-how-to-implement-infrastructure-more-quickly\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/e-mobility-how-to-implement-infrastructure-more-quickly\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.engineernewsnetwork.com\/blog\/"},{"@type":"ListItem","position":2,"name":"E-mobility: how to implement infrastructure more quickly"}]},{"@type":"WebSite","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#website","url":"https:\/\/www.engineernewsnetwork.com\/blog\/","name":"Engineer News Network","description":"The ultimate online news and information resource for today's engineer","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.engineernewsnetwork.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Person","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1","name":"admin","url":"https:\/\/www.engineernewsnetwork.com\/blog\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts\/25714","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/comments?post=25714"}],"version-history":[{"count":2,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts\/25714\/revisions"}],"predecessor-version":[{"id":25737,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts\/25714\/revisions\/25737"}],"wp:attachment":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/media?parent=25714"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/categories?post=25714"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/tags?post=25714"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}