{"id":26310,"date":"2023-10-12T09:30:00","date_gmt":"2023-10-12T08:30:00","guid":{"rendered":"https:\/\/www.engineernewsnetwork.com\/blog\/?p=26310"},"modified":"2023-10-11T11:31:09","modified_gmt":"2023-10-11T10:31:09","slug":"power-station-upgrades-safety-systems","status":"publish","type":"post","link":"https:\/\/www.engineernewsnetwork.com\/blog\/power-station-upgrades-safety-systems\/","title":{"rendered":"Power station upgrades safety systems"},"content":{"rendered":"\n<p><a href=\"https:\/\/www.omniflex.com\/solutions_legacy_alarm_annunciators.php?utm_source=Stone+Junction&amp;utm_medium=Hard+news&amp;utm_campaign=OMN308&amp;utm_id=OMN308\"><strong>Critical alarm<\/strong><\/a> specialist Omniflex has completed the replacement of two obsolete alarm units at Lerwick power station (LPS), the diesel-powered facility that provides energy to the Shetland Islands. Critical alarms are an essential part of safety protocols at remote industrial sites and an important part of regulatory compliance, so upgrading them in line with modern safety standards is crucial.<\/p>\n\n\n\n<p>LPS is the principal source of electricity for the Shetland Islands, fulfilling around 50% of the archipelago\u2019s electricity demand, as it is not connected to the National Grid. 30% is supplied by the nearby Sullom Voe Terminal power station, where Omniflex has conducted, and will soon conduct more, similar work to update their outdated alarm systems.<\/p>\n\n\n\n<p>The original manufacturers that supplied their alarm annunciators around 30 years ago are no longer operational and they do not meet IEC 61508 safety integrity level (SIL) standards. To replace the outdated systems, LPS engaged Omniflex who provided the solution in the form of IEC61508 SIL-1 certified alarm annunciators.<\/p>\n\n\n\n<p>\u201cObsolete alarm systems leave facilities and their staff at the mercy of equipment failure,\u201d explained Darren Barratt, product sales manager at Omniflex. \u201cThe alarm systems we fitted for Lerwick exceed the latest safety requirements and connect to the site\u2019s top-end system.<\/p>\n\n\n\n<p>\u201cWe\u2019ve supplied retrofit alarm units that fit directly into the existing space, using the previously installed wiring, and these were configured and fully tested off-site prior to installation, minimising the power station\u2019s downtime.\u201d concluded Barratt.<\/p>\n\n\n\n<p>One of the main concerns for facility managers is the support and availability of spares for obsolete safety systems, which are no longer supported by manufacturers or industrial servicing companies. To mitigate this, Omniflex offers lifetime product support across its whole range and has technical engineers available to assist the on-site installation companies, ensuring the replacement process is a smooth transition with minimal disruption and downtime.<\/p>\n\n\n\n<p>To find out more about navigating <a href=\"https:\/\/www.omniflex.com\/pub\/downloads\/omn262-omniflex-alarm-sector-overview-web.pdf?utm_source=Stone+Junction&amp;utm_medium=Hard+news&amp;utm_campaign=OMN308&amp;utm_id=OMN308\"><strong>alarm obsolescence<\/strong><\/a> in industrial facilities, read Omniflex\u2019s whitepaper on alarm annunciators and management.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Critical alarm specialist Omniflex has completed the replacement of two obsolete alarm units at Lerwick power station (LPS), the diesel-powered facility that provides energy to the Shetland Islands. Critical alarms are an essential part of safety protocols at remote industrial sites and an important part of regulatory compliance, so upgrading them in line with modern &hellip;<\/p>\n","protected":false},"author":1,"featured_media":26311,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[107],"tags":[7734,12156,12155,7202,63],"class_list":["post-26310","post","type-post","status-publish","format-standard","has-post-thumbnail","","category-power","tag-alarm-annunciators","tag-lerwick-power-station","tag-lps","tag-omniflex","tag-power"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Power station upgrades safety systems - Engineer News Network<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.engineernewsnetwork.com\/blog\/power-station-upgrades-safety-systems\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Power station upgrades safety systems - Engineer News Network\" \/>\n<meta property=\"og:description\" content=\"Critical alarm specialist Omniflex has completed the replacement of two obsolete alarm units at Lerwick power station (LPS), the diesel-powered facility that provides energy to the Shetland Islands. Critical alarms are an essential part of safety protocols at remote industrial sites and an important part of regulatory compliance, so upgrading them in line with modern &hellip;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.engineernewsnetwork.com\/blog\/power-station-upgrades-safety-systems\/\" \/>\n<meta property=\"og:site_name\" content=\"Engineer News Network\" \/>\n<meta property=\"article:published_time\" content=\"2023-10-12T08:30:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2023\/10\/OMN308-Engineers-installing-alarm-panel-IMAGE-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1920\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/power-station-upgrades-safety-systems\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/power-station-upgrades-safety-systems\\\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/#\\\/schema\\\/person\\\/4477342aea8e299c6a21761e513ea8e1\"},\"headline\":\"Power station upgrades safety systems\",\"datePublished\":\"2023-10-12T08:30:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/power-station-upgrades-safety-systems\\\/\"},\"wordCount\":331,\"image\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/power-station-upgrades-safety-systems\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/OMN308-Engineers-installing-alarm-panel-IMAGE-scaled.jpg\",\"keywords\":[\"alarm annunciators\",\"Lerwick power station\",\"LPS\",\"Omniflex\",\"power\"],\"articleSection\":[\"Power\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/power-station-upgrades-safety-systems\\\/\",\"url\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/power-station-upgrades-safety-systems\\\/\",\"name\":\"Power station upgrades safety systems - Engineer News Network\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/power-station-upgrades-safety-systems\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/power-station-upgrades-safety-systems\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/OMN308-Engineers-installing-alarm-panel-IMAGE-scaled.jpg\",\"datePublished\":\"2023-10-12T08:30:00+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/#\\\/schema\\\/person\\\/4477342aea8e299c6a21761e513ea8e1\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/power-station-upgrades-safety-systems\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/power-station-upgrades-safety-systems\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/power-station-upgrades-safety-systems\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/OMN308-Engineers-installing-alarm-panel-IMAGE-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/OMN308-Engineers-installing-alarm-panel-IMAGE-scaled.jpg\",\"width\":2560,\"height\":1920,\"caption\":\"Engineers install an alarm panel\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/power-station-upgrades-safety-systems\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Power station upgrades safety systems\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/\",\"name\":\"Engineer News Network\",\"description\":\"The ultimate online news and information resource for today's engineer\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/#\\\/schema\\\/person\\\/4477342aea8e299c6a21761e513ea8e1\",\"name\":\"admin\",\"url\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/author\\\/admin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Power station upgrades safety systems - Engineer News Network","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.engineernewsnetwork.com\/blog\/power-station-upgrades-safety-systems\/","og_locale":"en_GB","og_type":"article","og_title":"Power station upgrades safety systems - Engineer News Network","og_description":"Critical alarm specialist Omniflex has completed the replacement of two obsolete alarm units at Lerwick power station (LPS), the diesel-powered facility that provides energy to the Shetland Islands. Critical alarms are an essential part of safety protocols at remote industrial sites and an important part of regulatory compliance, so upgrading them in line with modern &hellip;","og_url":"https:\/\/www.engineernewsnetwork.com\/blog\/power-station-upgrades-safety-systems\/","og_site_name":"Engineer News Network","article_published_time":"2023-10-12T08:30:00+00:00","og_image":[{"width":2560,"height":1920,"url":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2023\/10\/OMN308-Engineers-installing-alarm-panel-IMAGE-scaled.jpg","type":"image\/jpeg"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Estimated reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/power-station-upgrades-safety-systems\/#article","isPartOf":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/power-station-upgrades-safety-systems\/"},"author":{"name":"admin","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1"},"headline":"Power station upgrades safety systems","datePublished":"2023-10-12T08:30:00+00:00","mainEntityOfPage":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/power-station-upgrades-safety-systems\/"},"wordCount":331,"image":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/power-station-upgrades-safety-systems\/#primaryimage"},"thumbnailUrl":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2023\/10\/OMN308-Engineers-installing-alarm-panel-IMAGE-scaled.jpg","keywords":["alarm annunciators","Lerwick power station","LPS","Omniflex","power"],"articleSection":["Power"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/power-station-upgrades-safety-systems\/","url":"https:\/\/www.engineernewsnetwork.com\/blog\/power-station-upgrades-safety-systems\/","name":"Power station upgrades safety systems - Engineer News Network","isPartOf":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/power-station-upgrades-safety-systems\/#primaryimage"},"image":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/power-station-upgrades-safety-systems\/#primaryimage"},"thumbnailUrl":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2023\/10\/OMN308-Engineers-installing-alarm-panel-IMAGE-scaled.jpg","datePublished":"2023-10-12T08:30:00+00:00","author":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1"},"breadcrumb":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/power-station-upgrades-safety-systems\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.engineernewsnetwork.com\/blog\/power-station-upgrades-safety-systems\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/power-station-upgrades-safety-systems\/#primaryimage","url":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2023\/10\/OMN308-Engineers-installing-alarm-panel-IMAGE-scaled.jpg","contentUrl":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2023\/10\/OMN308-Engineers-installing-alarm-panel-IMAGE-scaled.jpg","width":2560,"height":1920,"caption":"Engineers install an alarm panel"},{"@type":"BreadcrumbList","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/power-station-upgrades-safety-systems\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.engineernewsnetwork.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Power station upgrades safety systems"}]},{"@type":"WebSite","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#website","url":"https:\/\/www.engineernewsnetwork.com\/blog\/","name":"Engineer News Network","description":"The ultimate online news and information resource for today's engineer","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.engineernewsnetwork.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Person","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1","name":"admin","url":"https:\/\/www.engineernewsnetwork.com\/blog\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts\/26310","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/comments?post=26310"}],"version-history":[{"count":1,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts\/26310\/revisions"}],"predecessor-version":[{"id":26312,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts\/26310\/revisions\/26312"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/media\/26311"}],"wp:attachment":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/media?parent=26310"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/categories?post=26310"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/tags?post=26310"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}