{"id":34199,"date":"2026-10-28T10:00:00","date_gmt":"2026-10-28T10:00:00","guid":{"rendered":"https:\/\/www.engineernewsnetwork.com\/blog\/?p=34199"},"modified":"2026-10-20T17:37:32","modified_gmt":"2026-10-20T16:37:32","slug":"building-smarter-emergency-power-infrastructure","status":"publish","type":"post","link":"https:\/\/www.engineernewsnetwork.com\/blog\/building-smarter-emergency-power-infrastructure\/","title":{"rendered":"Building smarter emergency power infrastructure"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>Advancements in emergency power control systems are helping improve reliability, strengthen resiliency and meet evolving operational demands. John Stark highlights the role of intelligent automatic transfer switches, integrated controls, and automated monitoring and reporting in supporting uninterrupted patient care, simplifying compliance, and improving emergency power management<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Reliable emergency power systems have long been mandatory in hospitals, but the past decade has reshaped how healthcare organisations design, test, and manage these systems. Growing resiliency expectations, the expansion of multi-site care networks, and highly power-dependent medical technologies are driving a shift toward more sophisticated emergency power control systems (PCS&#8217;s). Today&#8217;s PCS&#8217;s must support not only life safety but also digital infrastructure, imaging, diagnostics, and surgical environments, setting a new operational standard for modern healthcare.\u00a0<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Traditional PCS&#8217;s focused primarily on quick restoration and regulatory compliance. Today, hospitals expect deeper intelligence and more actionable data. Modern monitoring platforms capture detailed pre-event, event, and post-event information, improving both predictive maintenance and documentation accuracy.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Automation is increasingly essential. Features such as automatic start signals, integrated controls, and real-time dashboards reduce manual intervention and support more consistent emergency response. Manufacturers in the controls and switching sector, including Russelectric, have developed software that automatically initiates event logging the moment a generator starts or closes onto the emergency bus (that software is also monitoring the system at all times, 24\/7. We need to make that clear). This capability is especially valuable as hospitals navigate staffing shortages and rising documentation workloads.\u00a0<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The industry is also seeing significant variation in the age and performance of installed PCS assets. Many hospitals continue to operate with older transfer switches (ATSs) that lack modern coordination or have limited fault withstand ratings. These legacy systems complicate expansion projects and may fall short of today&#8217;s operational expectations. Modern engineered ATS solutions, such as Russelectric&#8217;s John Stark which have a withstand and closing rating of 30 electrical cycles in duration, help eliminate these vulnerabilities and support more resilient system design.\u00a0<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Healthcare delivery has decentralised. Networks increasingly operate dozens or hundreds of outpatient locations such as ambulatory surgery centers, imaging suites, and specialty care facilities. Many of these sites once relied entirely on utility service or undersized standby generators. Today, expectations have changed: patients assume uninterrupted power wherever care is delivered.\u00a0<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This expansion has real operational implications. Off-campus facilities often require generator sets paired with ATS solutions that mirror the reliability and selectivity of main-campus infrastructure. To manage this distributed footprint, health systems are standardising equipment specifications and integrating outpatient sites into centralised reporting platforms. These efforts simplify maintenance planning, improve system visibility, and reduce variations between facilities.\u00a0<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large is-resized\"><a href=\"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2026\/10\/30-Cycle-BPISHi-REs-Photo.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"819\" height=\"1024\" src=\"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2026\/10\/30-Cycle-BPISHi-REs-Photo-819x1024.jpg\" alt=\"\" class=\"wp-image-34201\" style=\"aspect-ratio:0.7998170135784243;width:350px;height:auto\" srcset=\"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2026\/10\/30-Cycle-BPISHi-REs-Photo-819x1024.jpg 819w, https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2026\/10\/30-Cycle-BPISHi-REs-Photo-240x300.jpg 240w, https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2026\/10\/30-Cycle-BPISHi-REs-Photo-768x960.jpg 768w, https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2026\/10\/30-Cycle-BPISHi-REs-Photo-1229x1536.jpg 1229w, https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2026\/10\/30-Cycle-BPISHi-REs-Photo-1638x2048.jpg 1638w, https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2026\/10\/30-Cycle-BPISHi-REs-Photo.jpg 1800w\" sizes=\"auto, (max-width: 819px) 100vw, 819px\" \/><\/a><figcaption class=\"wp-element-caption\"><em>Russelectric&#8217;s RTS-30 Series<\/em><\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\"><strong>Transfer switch technology keeps pace with new demands\u00a0<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Automatic transfer switches remain the heart of every PCS. Their performance influences transfer timing, selective co-ordination, and system, making equipment selection critical for patient\u00a0safety.\u00a0<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In the past 35 years, electrical code cycles have emphasised selective co-ordination in legally required standby systems. This requirement ostensibly opens only the nearest upstream protective device during a fault, preserving power to all unaffected circuits. Manufacturers responded by engineering ATS solutions with stronger withstand and closing ratings. In the possible event that this does not happen, due to malfunction or tampering with trip units, the ATS should be built to withstand and close on the maximum fault current availability, which is typically 30.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Russelectric&#8217;s RTS-30 Series exemplifies this shift. The\u00a0switches are UL-1008 tested, listed, and labelled for both\u00a030-cycle and 3-cycle applications. These\u00a0high-performance ratings support robust co-ordination\u00a0schemes in hospitals and other mission-critical settings.\u00a0<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Although budget constraints sometimes force facilities to\u00a0upgrade ATS units in stages, using switches engineered for selective co-ordination requirements protects essential circuits and reduces regulatory risk.\u00a0<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In parallel, modern ATS control interfaces provide deeper visibility into load behavior, transfer timing, and normal\/emergency source verification \u2014 giving operators the insight needed to confirm that each transition performs as expected.\u00a0<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Integrating UPS and controls for seamless operation\u00a0<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">While ATS units and generators supply the backbone of emergency power, many hospital departments, including imaging, IT, and lab environments, depend on uninterruptible power supply (UPS) systems to eliminate even millisecond-level interruptions which can happen during the transfer switching function.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Manufacturers in the switching and controls space increasingly design power control systems to integrate smoothly with UPS, BMS, and SCADA platforms. Co-ordinated sequencing logic and unified communication protocols support &#8216;no-break&#8217; transitions, helping digital and diagnostic equipment remain stable throughout a brief outage. As hospitals adopt more connected medical devices and cloud-based platforms, this level of PCS integration will only grow more in importance.\u00a0<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Data-driven reporting simplifies compliance\u00a0<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Reporting has become one of the most time-consuming aspects of PCS management. Hospitals must document monthly load tests, the annual four-hour test, and any unplanned outages to meet both CMS requirements and (where applicable) The Joint Commission&#8217;s standards. Manual documentation consumes staff time and increases the risk of missing or incomplete records.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">New digital tools solve this challenge. Platforms like Russelectric&#8217;s generator system run reporting feature (Engine Run Reporting) automatically record testing data the moment generator start signals are issued or when the system transfers onto emergency power. The software captures load levels, sequence timing, transfer durations, measures and records all power conditions and all relevant event details, creating a tamper-proof, time-stamped record aligned with compliance expectations.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This automation enables hospitals to maintain complete records, even with limited staffing, and ensures reporting remains accurate and audit-ready.\u00a0<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>AI and advanced automation\u00a0<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Healthcare organisations are preparing for a new\u00a0generation of PCS technologies driven by artificial\u00a0intelligence. Predictive algorithms can identify\u00a0anomalies before an outage, improve load\u00a0management, and help operators understand\u00a0long-term performance trends. Over time,\u00a0<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">AI-enhanced controls may dynamically adjust transfer\u00a0sequences based on real-time load behaviour or\u00a0environmental conditions.\u00a0<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00a0As these functions mature, the PCS will increasingly resemble advanced building management systems \u2014 automated, integrated, and continuously optimising performance without requiring constant operator oversight.\u00a0<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Advancing toward a more resilient, intelligent power ecosystem<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As healthcare continues to decentralise, digitise, and demand higher reliability, emergency power infrastructure must evolve with it. Modern PCS designs emphasise smart controls, robust ATS performance, UPS integration, and automated reporting that reduces administrative burden. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">While no single configuration fits every facility, the industry&#8217;s trajectory is clear: hospitals and outpatient centers are moving toward more co-ordinated, data-driven, and maintainable emergency power systems, better prepared for the demands of modern healthcare operations.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">John Stark is with <strong><a href=\"https:\/\/www.siemens.com\/en-us\/products\/russelectric\/\" type=\"link\" id=\"https:\/\/www.siemens.com\/en-us\/products\/russelectric\/\">Russelectric<\/a>.\u00a0<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Advancements in emergency power control systems are helping improve reliability, strengthen resiliency and meet evolving operational demands. John Stark highlights the role of intelligent automatic transfer switches, integrated controls, and automated monitoring and reporting in supporting uninterrupted patient care, simplifying compliance, and improving emergency power management Reliable emergency power systems have long been mandatory in &hellip;<\/p>\n","protected":false},"author":1,"featured_media":34200,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[199,107],"tags":[15809,15810,3727],"class_list":["post-34199","post","type-post","status-publish","format-standard","has-post-thumbnail","","category-news-views-and-opinion","category-power","tag-emergency-power-systems","tag-john-stark","tag-russelectric"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Building smarter emergency power infrastructure - Engineer News Network<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.engineernewsnetwork.com\/blog\/building-smarter-emergency-power-infrastructure\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Building smarter emergency power infrastructure - Engineer News Network\" \/>\n<meta property=\"og:description\" content=\"Advancements in emergency power control systems are helping improve reliability, strengthen resiliency and meet evolving operational demands. John Stark highlights the role of intelligent automatic transfer switches, integrated controls, and automated monitoring and reporting in supporting uninterrupted patient care, simplifying compliance, and improving emergency power management Reliable emergency power systems have long been mandatory in &hellip;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.engineernewsnetwork.com\/blog\/building-smarter-emergency-power-infrastructure\/\" \/>\n<meta property=\"og:site_name\" content=\"Engineer News Network\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-28T10:00:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2026\/10\/BOM-Spotlight-NR-Photo-PCS-4.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1500\" \/>\n\t<meta property=\"og:image:height\" content=\"1200\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/building-smarter-emergency-power-infrastructure\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/building-smarter-emergency-power-infrastructure\\\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/#\\\/schema\\\/person\\\/4477342aea8e299c6a21761e513ea8e1\"},\"headline\":\"Building smarter emergency power infrastructure\",\"datePublished\":\"2026-10-28T10:00:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/building-smarter-emergency-power-infrastructure\\\/\"},\"wordCount\":1058,\"image\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/building-smarter-emergency-power-infrastructure\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/BOM-Spotlight-NR-Photo-PCS-4.jpg\",\"keywords\":[\"emergency power systems\",\"John Stark\",\"Russelectric\"],\"articleSection\":[\"News, Views and Opinion\",\"Power\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/building-smarter-emergency-power-infrastructure\\\/\",\"url\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/building-smarter-emergency-power-infrastructure\\\/\",\"name\":\"Building smarter emergency power infrastructure - Engineer News Network\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/building-smarter-emergency-power-infrastructure\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/building-smarter-emergency-power-infrastructure\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/BOM-Spotlight-NR-Photo-PCS-4.jpg\",\"datePublished\":\"2026-10-28T10:00:00+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/#\\\/schema\\\/person\\\/4477342aea8e299c6a21761e513ea8e1\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/building-smarter-emergency-power-infrastructure\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/building-smarter-emergency-power-infrastructure\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/building-smarter-emergency-power-infrastructure\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/BOM-Spotlight-NR-Photo-PCS-4.jpg\",\"contentUrl\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/BOM-Spotlight-NR-Photo-PCS-4.jpg\",\"width\":1500,\"height\":1200,\"caption\":\"Modern engineered ATS solutions, such as Russelectric's RTS-30 Series, which have a withstand and closing rating of 30 electrical cycles in duration, help eliminate these vulnerabilities and support more resilient system design\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/building-smarter-emergency-power-infrastructure\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Building smarter emergency power infrastructure\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/\",\"name\":\"Engineer News Network\",\"description\":\"The ultimate online news and information resource for today&#039;s engineer\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/#\\\/schema\\\/person\\\/4477342aea8e299c6a21761e513ea8e1\",\"name\":\"admin\",\"url\":\"https:\\\/\\\/www.engineernewsnetwork.com\\\/blog\\\/author\\\/admin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Building smarter emergency power infrastructure - Engineer News Network","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.engineernewsnetwork.com\/blog\/building-smarter-emergency-power-infrastructure\/","og_locale":"en_GB","og_type":"article","og_title":"Building smarter emergency power infrastructure - Engineer News Network","og_description":"Advancements in emergency power control systems are helping improve reliability, strengthen resiliency and meet evolving operational demands. John Stark highlights the role of intelligent automatic transfer switches, integrated controls, and automated monitoring and reporting in supporting uninterrupted patient care, simplifying compliance, and improving emergency power management Reliable emergency power systems have long been mandatory in &hellip;","og_url":"https:\/\/www.engineernewsnetwork.com\/blog\/building-smarter-emergency-power-infrastructure\/","og_site_name":"Engineer News Network","article_published_time":"2026-10-28T10:00:00+00:00","og_image":[{"width":1500,"height":1200,"url":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2026\/10\/BOM-Spotlight-NR-Photo-PCS-4.jpg","type":"image\/jpeg"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Estimated reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/building-smarter-emergency-power-infrastructure\/#article","isPartOf":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/building-smarter-emergency-power-infrastructure\/"},"author":{"name":"admin","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1"},"headline":"Building smarter emergency power infrastructure","datePublished":"2026-10-28T10:00:00+00:00","mainEntityOfPage":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/building-smarter-emergency-power-infrastructure\/"},"wordCount":1058,"image":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/building-smarter-emergency-power-infrastructure\/#primaryimage"},"thumbnailUrl":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2026\/10\/BOM-Spotlight-NR-Photo-PCS-4.jpg","keywords":["emergency power systems","John Stark","Russelectric"],"articleSection":["News, Views and Opinion","Power"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/building-smarter-emergency-power-infrastructure\/","url":"https:\/\/www.engineernewsnetwork.com\/blog\/building-smarter-emergency-power-infrastructure\/","name":"Building smarter emergency power infrastructure - Engineer News Network","isPartOf":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/building-smarter-emergency-power-infrastructure\/#primaryimage"},"image":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/building-smarter-emergency-power-infrastructure\/#primaryimage"},"thumbnailUrl":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2026\/10\/BOM-Spotlight-NR-Photo-PCS-4.jpg","datePublished":"2026-10-28T10:00:00+00:00","author":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1"},"breadcrumb":{"@id":"https:\/\/www.engineernewsnetwork.com\/blog\/building-smarter-emergency-power-infrastructure\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.engineernewsnetwork.com\/blog\/building-smarter-emergency-power-infrastructure\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/building-smarter-emergency-power-infrastructure\/#primaryimage","url":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2026\/10\/BOM-Spotlight-NR-Photo-PCS-4.jpg","contentUrl":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-content\/uploads\/2026\/10\/BOM-Spotlight-NR-Photo-PCS-4.jpg","width":1500,"height":1200,"caption":"Modern engineered ATS solutions, such as Russelectric's RTS-30 Series, which have a withstand and closing rating of 30 electrical cycles in duration, help eliminate these vulnerabilities and support more resilient system design"},{"@type":"BreadcrumbList","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/building-smarter-emergency-power-infrastructure\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.engineernewsnetwork.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Building smarter emergency power infrastructure"}]},{"@type":"WebSite","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#website","url":"https:\/\/www.engineernewsnetwork.com\/blog\/","name":"Engineer News Network","description":"The ultimate online news and information resource for today&#039;s engineer","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.engineernewsnetwork.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Person","@id":"https:\/\/www.engineernewsnetwork.com\/blog\/#\/schema\/person\/4477342aea8e299c6a21761e513ea8e1","name":"admin","url":"https:\/\/www.engineernewsnetwork.com\/blog\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts\/34199","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/comments?post=34199"}],"version-history":[{"count":1,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts\/34199\/revisions"}],"predecessor-version":[{"id":34202,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/posts\/34199\/revisions\/34202"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/media\/34200"}],"wp:attachment":[{"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/media?parent=34199"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/categories?post=34199"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.engineernewsnetwork.com\/blog\/wp-json\/wp\/v2\/tags?post=34199"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}