Home / News, Views and Opinion / Amarinth delivers API 610 VS4 pumps to Abu Dhabi waste water treatment plant

Amarinth delivers API 610 VS4 pumps to Abu Dhabi waste water treatment plant

Amarinth API 610 VS4 vertical pump being packaged ready for shipment to Metito
Amarinth has delivered an order of API 610 VS4 pumps to Metito for installation in a waste water treatment plant at the ADCO Al Dabb’iya Facilities Development Phase III project, Abu Dhabi.

Amarinth secured its first order of pumps from Metito, a provider of intelligent water management solutions, earlier this year.



The API 610 VS4 vertical pumps will be installed in an effluent treatment package at the ADCO Al Dabb’iya Facilities Development Phase III project, which is located 40 kilometres south-west of Abu Dhabi.

Like the many other pumps that Amarinth has supplied to ADCO process application projects, this waste water treatment package required high specification pumps.

The API 610 VS4 deoiler pumps must operate reliably at low NPSH for the plant to successfully separate the oil from the waste water.

The pumps were manufactured in super duplex stainless steel to withstand the corrosive fluid. Amarinth drew on its extensive knowledge of ADCO specifications and requirements to deliver a cost-effective design in under 20 weeks for this waste water application.

Check Also

Gas filter for high‑performance industrial and medical gas systems

WITT Gas Controls is expanding its portfolio of high‑performance gas system components with the introduction …

A holistic view of facility drains

Viking Kristjansson reframes facility drainage from a forgotten utility into a strategic asset, revealing how …

£6.5bn loss to economy if UK sees fall in engineering grads

A decline in engineering graduates could wipe £6.5bn from the UK economy by 2035, according to …

Leave a Reply

Your email address will not be published. Required fields are marked *