Home / Design / How to manage obsolescence in industrial control panels

How to manage obsolescence in industrial control panels

Learn how industrial plant managers can manage obsolescence in control panels

With the growth of automation systems within industrial businesses, it’s important to consider the ‘shelf life’ of these applications.  Managing obsolescence in control panels is a particular challenge but here, Maria Torrisi explains how this can be managed effectively

Over the past 50 years, a growing number of industrial businesses have adopted computer-based automation systems.

However, many of these systems are now nearing their official end-of-life and becoming obsolete, leaving engineers with the challenge of managing obsolescence effectively.



The control panel is the backbone of the modern industrial plant. Whether a business is at the forefront of the Fourth Industrial Revolution or focussed more on day-to-day production, automation is pivotal for modern industrial companies.

While these systems present plant managers with a wealth of benefits in the form of efficiency savings and improved effectiveness, their importance is beginning to pose a unique challenge for industrial businesses.

Today, many plants still use the control panels installed several decades ago, which means they are now verging on obsolescence.

Although businesses can partner with specialists to supply obsolete industrial components, a growing number of plant managers are realising that modernising systems is more beneficial and less risky in the long-term.

However, this is rarely an easy task, as the control system is often responsible for controlling an important process that can significantly harm productivity if stopped.

For example, it might be that a control system is responsible for managing a conveyor in a dairy production plant.

Since dairy is a sensitive food item that must be handled carefully and promptly with full traceability, even a momentary pause in production can mean an entire line of product must be disposed of to ensure safety standards.

So, how do you manage obsolescence in a critical control system? From JMartans’ experience as a systems integrator in Malta, we’ve found that the best approach is to complete an upgrade or replacement project in phases.

By doing this, plants can minimise operational disruption.

This could mean replacing the front end of a control system first, such as by modernising a SCADA system and ensuring it works with the obsolete
components and equipment, before upgrading those individual obsolete parts.

A systems integrator taking this phased approach can then avoid causing costly, unwanted downtime and ensure systems remain operational.

The reason why many industrial businesses continue using legacy equipment purchased decades ago is often due to the risk of planned downtime affecting performance.

By working with an experienced automation systems integrator like JMartans, plant managers can get the best of both worlds: an effective, modern control panel without lost production.

Maria Torrisi is business development manager at industrial automation expert JMartans Automation.

Check Also

Generator can also run on hydrotreated vegetable oil 

Kohler Power Systems expands its KD Series line of industrial generators with a new model, …

Rugged PC enables power-efficient embedded computing for industrial projects

Embedded systems and display solutions provider, Review Display Systems (RDS) has announced the introduction of …

Bio-based products drive industrial disruption

The principles of reduce, reuse, and recycle have turned the focus into exploring bio-based products …